Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
-0.013
vs Nov 25
7-day average
0.010
Bcf/d
30-day average
0.004
30 of 30 days posted
30-day high
0.013
Nov 25
30-day low
0.000
Nov 26
Operating capacity
0.038
Bcf/d as posted, timely cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0050.0100.015Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.000-0.013
Nov 250.013+0.001
Nov 240.012+0.000
Nov 230.012+0.000
Nov 220.012+0.000
Nov 210.012+0.000
Nov 200.012+0.000
Nov 190.012+0.001
Nov 180.010+0.002
Nov 170.008+0.004
Nov 160.004+0.000
Nov 150.004+0.000
Nov 140.004+0.004
Nov 130.000-0.004
Nov 120.004+0.000
Nov 110.004+0.004
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000-0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000+0.000
Oct 280.000—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)Black River

Columbia Gas Transmission (TCO)Placed at the center of Pendleton, KY — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational