Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

CPA Gypsum

Columbia Gas Transmission (TCO) · Loc 635985 · BEAVER, Pennsylvania
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.005
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.004
Bcf/d
30-day average
0.004
30 of 30 days posted
30-day high
0.006
Nov 3
30-day low
0.000
Oct 30
Operating capacity
0.007
Bcf/d as posted, timely cycle
Utilization
76%
headroom 24%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0020.0040.006Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.005+0.000
Nov 260.005+0.000
Nov 250.005+0.002
Nov 240.004-0.000
Nov 230.004+0.000
Nov 220.004+0.000
Nov 210.004+0.000
Nov 200.003+0.000
Nov 190.003-0.001
Nov 180.004+0.000
Nov 170.004-0.001
Nov 160.005+0.000
Nov 150.005+0.000
Nov 140.005+0.000
Nov 130.005+0.001
Nov 120.004+0.000
Nov 110.004+0.001
Nov 100.003-0.000
Nov 90.004+0.000
Nov 80.004+0.000
Nov 70.004+0.000
Nov 60.004+0.000
Nov 50.004+0.001
Nov 40.003-0.003
Nov 30.006+0.002
Nov 20.004+0.000
Nov 10.004-0.002
Oct 310.006+0.006
Oct 300.000-0.005
Oct 290.005—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)CPA Gypsum

Columbia Gas Transmission (TCO)Placed at the center of Beaver, PA — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CPA Gypsum (Columbia Gas Transmission (TCO) loc 635985) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/635985/