Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

SHAW ROAD

Columbia Gas Transmission (TCO) · Loc 843511 · LOUDOUN, Virginia
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.022
Bcf/d scheduled
Δ Day-over-day
+0.002
vs Nov 25
7-day average
0.021
Bcf/d
30-day average
0.020
30 of 30 days posted
30-day high
0.022
Nov 26
30-day low
0.011
Nov 13
Operating capacity
0.036
Bcf/d as posted, timely cycle
Utilization
60%
headroom 40%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.022+0.002
Nov 250.020+0.000
Nov 240.020-0.002
Nov 230.022+0.000
Nov 220.022+0.000
Nov 210.022+0.002
Nov 200.020+0.000
Nov 190.020+0.000
Nov 180.020+0.000
Nov 170.020-0.001
Nov 160.021+0.000
Nov 150.021+0.000
Nov 140.021+0.010
Nov 130.011-0.009
Nov 120.020+0.000
Nov 110.020+0.005
Nov 100.015-0.005
Nov 90.020+0.000
Nov 80.020+0.000
Nov 70.020+0.000
Nov 60.020+0.000
Nov 50.020-0.001
Nov 40.021+0.000
Nov 30.021-0.001
Nov 20.021+0.000
Nov 10.021+0.001
Oct 310.021+0.000
Oct 300.021+0.000
Oct 290.021+0.000
Oct 280.021—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)SHAW ROAD

Columbia Gas Transmission (TCO)Placed at the center of Loudoun, VA — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SHAW ROAD (Columbia Gas Transmission (TCO) loc 843511) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/843511/