Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Constellation Big Sandy

Columbia Gas Transmission (TCO) · Loc 836799
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.002
Bcf/d
30-day average
0.004
30 of 30 days posted
30-day high
0.015
Oct 29
30-day low
0.000
Nov 27
Operating capacity
0.090
Bcf/d as posted, timely cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0050.0100.015Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000-0.008
Nov 250.008+0.000
Nov 240.008+0.008
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000-0.005
Nov 170.005-0.002
Nov 160.007+0.000
Nov 150.007+0.000
Nov 140.007+0.002
Nov 130.005+0.000
Nov 120.005+0.000
Nov 110.005+0.000
Nov 100.005+0.000
Nov 90.005+0.000
Nov 80.005+0.000
Nov 70.005+0.005
Nov 60.000-0.008
Nov 50.008+0.000
Nov 40.008+0.000
Nov 30.008+0.008
Nov 20.000+0.000
Nov 10.000-0.002
Oct 310.002+0.002
Oct 300.000-0.015
Oct 290.015—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)Constellation Big Sandy

Columbia Gas Transmission (TCO)Placed at the center of Wayne, WV — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Constellation Big Sandy (Columbia Gas Transmission (TCO) loc 836799) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/836799/