Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Warren Co.

Columbia Gas Transmission (TCO) · Loc 842564
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.204
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.201
Bcf/d
30-day average
0.054
30 of 30 days posted
30-day high
0.204
Nov 27
30-day low
0.000
Nov 17
Operating capacity
0.246
Bcf/d as posted, timely cycle
Utilization
83%
headroom 17%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.204+0.000
Nov 260.204+0.000
Nov 250.204+0.005
Nov 240.199+0.000
Nov 230.199+0.000
Nov 220.199+0.000
Nov 210.199+0.101
Nov 200.098+0.001
Nov 190.097+0.073
Nov 180.025+0.025
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000+0.000
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)Warren Co.

Columbia Gas Transmission (TCO)Plant location from EIA Form 860 (plant 55939).

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Warren Co. (Columbia Gas Transmission (TCO) loc 842564) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/842564/