Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

GAE - AES LAKE LYNN

Columbia Gas Transmission (TCO) · Loc 636563
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.000
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.015
Oct 29
30-day low
0.000
Nov 27
Operating capacity
0.024
Bcf/d as posted, timely cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0050.0100.015Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000-0.005
Nov 190.005+0.000
Nov 180.005+0.000
Nov 170.005+0.000
Nov 160.005+0.000
Nov 150.005+0.000
Nov 140.005+0.005
Nov 130.000-0.008
Nov 120.008+0.000
Nov 110.008+0.008
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000-0.005
Nov 60.005+0.005
Nov 50.000-0.002
Nov 40.002+0.002
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000-0.010
Oct 310.010+0.000
Oct 300.010-0.005
Oct 290.015—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)GAE - AES LAKE LYNN

Columbia Gas Transmission (TCO)Placed at the center of Fayette, PA — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, GAE - AES LAKE LYNN (Columbia Gas Transmission (TCO) loc 636563) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/636563/