Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

BHGD/TIGT SEG 125 EFM RETAIL MASTER

Tallgrass Interstate Gas Transmission (TIGT) · Loc 37743 · CHEYENNE, Nebraska
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.000
Bcf/d
30-day average
0.002
30 of 30 days posted
30-day high
0.007
Nov 2
30-day low
0.000
Oct 29
Operating capacity
0.000
Bcf/d as posted, evening cycle
Utilization
100%
headroom 0%

Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0020.0040.0060.008Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000-0.000
Nov 190.001+0.000
Nov 180.001+0.000
Nov 170.001+0.000
Nov 160.001+0.000
Nov 150.001+0.000
Nov 140.001+0.000
Nov 130.001+0.000
Nov 120.001+0.000
Nov 110.001+0.000
Nov 100.001+0.000
Nov 90.001+0.000
Nov 80.001+0.000
Nov 70.001+0.000
Nov 60.001-0.001
Nov 50.002+0.000
Nov 40.002-0.000
Nov 30.002-0.005
Nov 20.007+0.000
Nov 10.007+0.002
Oct 310.005+0.000
Oct 300.005+0.005
Oct 290.000-0.002
Oct 280.003—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
BHGD/TIGT SEG 125 EFM RETAIL MASTER

Placed at the center of Cheyenne, NE — approximate; the exact meter site is not published.

Recent notices on Tallgrass Interstate Gas Transmission (TIGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BHGD/TIGT SEG 125 EFM RETAIL MASTER (Tallgrass Interstate Gas Transmission (TIGT) loc 37743) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/37743/