Gas day Nov 27
0.004
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.004
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.004
Nov 23
30-day low
0.002
Oct 30
Operating capacity
0.020
Bcf/d as posted, evening cycle
Utilization
18%
headroom 82%
Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.004 | +0.000 |
| Nov 26 | 0.004 | +0.000 |
| Nov 25 | 0.004 | +0.000 |
| Nov 24 | 0.004 | -0.001 |
| Nov 23 | 0.004 | +0.000 |
| Nov 22 | 0.004 | +0.000 |
| Nov 21 | 0.004 | +0.001 |
| Nov 20 | 0.003 | +0.000 |
| Nov 19 | 0.003 | +0.000 |
| Nov 18 | 0.003 | +0.000 |
| Nov 17 | 0.003 | +0.001 |
| Nov 16 | 0.002 | +0.000 |
| Nov 15 | 0.002 | +0.000 |
| Nov 14 | 0.002 | -0.001 |
| Nov 13 | 0.003 | +0.000 |
| Nov 12 | 0.003 | +0.000 |
| Nov 11 | 0.003 | -0.000 |
| Nov 10 | 0.003 | -0.001 |
| Nov 9 | 0.003 | +0.000 |
| Nov 8 | 0.003 | +0.000 |
| Nov 7 | 0.003 | +0.000 |
| Nov 6 | 0.003 | +0.000 |
| Nov 5 | 0.003 | +0.000 |
| Nov 4 | 0.003 | +0.000 |
| Nov 3 | 0.003 | +0.001 |
| Nov 2 | 0.003 | +0.000 |
| Nov 1 | 0.003 | +0.001 |
| Oct 31 | 0.002 | +0.000 |
| Oct 30 | 0.002 | -0.000 |
| Oct 29 | 0.002 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Placed at the center of Lincoln, NE — approximate; the exact meter site is not published.
Notices
Recent notices on Tallgrass Interstate Gas Transmission (TIGT)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.
SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on Tallgrass Interstate Gas Transmission (TIGT)
- Colorado Lateral Consolidated Point 0.023 Bcf/d
- NWC/TIGT GRAND ISLAND SO E CDP HALL 0.012 Bcf/d
- HASTINGS/TIGT TBS ADAMS 0.004 Bcf/d
- NWC/TIGT KEARNEY BUFFALO 0.001 Bcf/d
- BHGD/TIGT SEG 105 EFM RETAIL MASTER 0.001 Bcf/d
- BHGD/TIGT SEG 740 EFM RETAIL MASTER 0.001 Bcf/d
- BHGD/TIGT SEG 125 EFM RETAIL MASTER 0.000 Bcf/d
- CNTL CTY/TIGT CENTRAL CITY TBS MERR 0.000 Bcf/d
Cite thisEnercast PipeScrape, NWC/TIGT N PLATTE HALL (Tallgrass Interstate Gas Transmission (TIGT) loc 16500) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/16500/