Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

NWC/TIGT N PLATTE HALL

Tallgrass Interstate Gas Transmission (TIGT) · Loc 16500 · LINCOLN, Nebraska
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.004
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.004
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.004
Nov 23
30-day low
0.002
Oct 30
Operating capacity
0.020
Bcf/d as posted, evening cycle
Utilization
18%
headroom 82%

Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0020.0040.006Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.004+0.000
Nov 260.004+0.000
Nov 250.004+0.000
Nov 240.004-0.001
Nov 230.004+0.000
Nov 220.004+0.000
Nov 210.004+0.001
Nov 200.003+0.000
Nov 190.003+0.000
Nov 180.003+0.000
Nov 170.003+0.001
Nov 160.002+0.000
Nov 150.002+0.000
Nov 140.002-0.001
Nov 130.003+0.000
Nov 120.003+0.000
Nov 110.003-0.000
Nov 100.003-0.001
Nov 90.003+0.000
Nov 80.003+0.000
Nov 70.003+0.000
Nov 60.003+0.000
Nov 50.003+0.000
Nov 40.003+0.000
Nov 30.003+0.001
Nov 20.003+0.000
Nov 10.003+0.001
Oct 310.002+0.000
Oct 300.002-0.000
Oct 290.002—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
NWC/TIGT N PLATTE HALL

Placed at the center of Lincoln, NE — approximate; the exact meter site is not published.

Recent notices on Tallgrass Interstate Gas Transmission (TIGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NWC/TIGT N PLATTE HALL (Tallgrass Interstate Gas Transmission (TIGT) loc 16500) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/16500/