NWC/TIGT GRAND ISLAND SO E CDP HALL

Tallgrass Interstate Gas Transmission (TIGT) · Loc 16502 · HALL, Nebraska
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.012
Bcf/d scheduled
Δ Day-over-day
+0.002
vs Nov 26
7-day average
0.012
Bcf/d
30-day average
0.010
30 of 30 days posted
30-day high
0.014
Nov 23
30-day low
0.005
Nov 1
Operating capacity
0.056
Bcf/d as posted, evening cycle
Utilization
21%
headroom 79%

Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.015Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.012+0.002
Nov 260.010-0.003
Nov 250.013+0.000
Nov 240.013-0.001
Nov 230.014+0.003
Nov 220.010+0.001
Nov 210.010-0.001
Nov 200.011-0.000
Nov 190.011+0.000
Nov 180.011+0.000
Nov 170.011-0.001
Nov 160.012+0.003
Nov 150.010-0.002
Nov 140.012-0.000
Nov 130.012+0.002
Nov 120.010-0.000
Nov 110.011+0.002
Nov 100.009-0.001
Nov 90.010+0.003
Nov 80.007+0.000
Nov 70.007-0.005
Nov 60.012+0.000
Nov 50.012+0.003
Nov 40.009+0.000
Nov 30.008+0.000
Nov 20.008+0.003
Nov 10.005-0.002
Oct 310.007-0.002
Oct 300.010+0.003
Oct 290.007—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
NWC/TIGT GRAND ISLAND SO E CDP HALL

Placed at the center of Hall, NE — approximate; the exact meter site is not published.

Recent notices on Tallgrass Interstate Gas Transmission (TIGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NWC/TIGT GRAND ISLAND SO E CDP HALL (Tallgrass Interstate Gas Transmission (TIGT) loc 16502) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/16502/