Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.000
Bcf/d
30-day average
0.006
30 of 30 days posted
30-day high
0.030
Nov 4
30-day low
0.000
Nov 27
Operating capacity
0.421
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%
Scheduled quantities as posted by Southern Natural Gas on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.000 | +0.000 |
| Nov 26 | 0.000 | +0.000 |
| Nov 25 | 0.000 | +0.000 |
| Nov 24 | 0.000 | +0.000 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | +0.000 |
| Nov 20 | 0.000 | +0.000 |
| Nov 19 | 0.000 | +0.000 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | +0.000 |
| Nov 12 | 0.000 | +0.000 |
| Nov 11 | 0.000 | +0.000 |
| Nov 10 | 0.000 | +0.000 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | +0.000 |
| Nov 7 | 0.000 | -0.020 |
| Nov 6 | 0.020 | +0.000 |
| Nov 5 | 0.020 | -0.010 |
| Nov 4 | 0.030 | +0.010 |
| Nov 3 | 0.020 | +0.000 |
| Nov 2 | 0.020 | +0.000 |
| Nov 1 | 0.020 | +0.000 |
| Oct 31 | 0.020 | +0.000 |
| Oct 30 | 0.020 | +0.000 |
| Oct 29 | 0.020 | — |
70 more days on file for this meter, back to August 20, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Southern Natural GasPlant location from EIA Form 860 (plant 10).
Notices
Recent notices on Southern Natural Gas
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Southern Natural Gas notices →
Southern Natural Gas · posted 2026-11-23 · effective 2026-11-23 · informational
Southern Natural Gas · posted 2026-11-23 · effective 2026-11-22 · force majeure
Southern Natural Gas declared force majeure effective gas day November 22, 2026 due to an unscheduled pipeline outage on the South Main Loop Line east of the York compressor station (Segment 440, Zone 1/2 S Boundary) in Sumter County, AL. Capacity on Segment 440 is reduced by 500…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Power Generation meters on Southern Natural Gas
- SO CO/SNG PLANT MCDONOUGH COBB (Georgia Power Co) 0.386 Bcf/d
- SO CO/SNG PLANT MCINTOSH EFFINGHAM (Georgia Power Co) 0.185 Bcf/d
- SO CO/SNG PLANT FRANKLIN (GOAT ROCK) (Southern Power Co) 0.178 Bcf/d
- SO CO/SNG PLANT HARRIS AUTAUGA (Southern Power Co) 0.049 Bcf/d
- DESOUTHC/SNG PLANT URQUHART AIKEN (Dominion Energy South Carolina Inc) 0.035 Bcf/d
- OGLETHRP/SNG PLANT SEWELL CREEK POL (Oglethorpe Power Corporation) 0.000 Bcf/d
- OGLETHRP/SNG TAL (Oglethorpe Power Corporation) 0.000 Bcf/d
- AL SANDE/SNG PLANT SANDERSVILLE WAS (SEPG Operating Services LLC ALS) 0.000 Bcf/d
Cite thisEnercast PipeScrape, SO CO/SNG PLANT GREENE MARENGO (Alabama Power Co) (Southern Natural Gas loc 801600) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/sng/801600/