Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

SO CO/SNG PLANT MCINTOSH EFFINGHAM (Georgia Power Co)

Southern Natural Gas · Loc 600081 · Effingham County, GA
Power plant delivery · counted in Power Generation · owner Georgia Power Co
Gas day Nov 26
0.185
Bcf/d scheduled
Δ Day-over-day
-0.021
vs Nov 25
7-day average
0.169
Bcf/d
30-day average
0.171
30 of 30 days posted
30-day high
0.207
Nov 16
30-day low
0.123
Oct 28
Operating capacity
0.334
Bcf/d as posted, evening cycle
Utilization
55%
headroom 45%

Scheduled quantities as posted by Southern Natural Gas on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.185-0.021
Nov 250.206+0.006
Nov 240.200+0.053
Nov 230.147+0.000
Nov 220.147+0.000
Nov 210.147+0.000
Nov 200.147-0.043
Nov 190.190+0.015
Nov 180.175-0.015
Nov 170.190-0.017
Nov 160.207+0.000
Nov 150.207+0.000
Nov 140.207+0.017
Nov 130.190+0.046
Nov 120.144-0.003
Nov 110.147+0.001
Nov 100.146-0.001
Nov 90.147+0.000
Nov 80.147+0.000
Nov 70.147-0.053
Nov 60.200+0.000
Nov 50.200+0.000
Nov 40.200+0.003
Nov 30.197+0.050
Nov 20.147+0.000
Nov 10.147-0.022
Oct 310.170+0.000
Oct 300.170+0.022
Oct 290.147+0.024
Oct 280.123—
69 more days on file for this meter, back to August 20, 2026. Full meter-level history is part of Institutional (API and downloads).
Southern Natural GasSO CO/SNG PLANT MCINTOSH EFFINGHAM (Georgia Power Co)

Southern Natural GasPlaced at the center of Effingham County, GA — approximate; the exact meter site is not published.

Recent notices on Southern Natural Gas

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Southern Natural Gas notices →

Southern Natural Gas · posted 2026-11-23 · effective 2026-11-23 · informational
Southern Natural Gas · posted 2026-11-23 · effective 2026-11-22 · force majeure
Southern Natural Gas declared force majeure effective gas day November 22, 2026 due to an unscheduled pipeline outage on the South Main Loop Line east of the York compressor station (Segment 440, Zone 1/2 S Boundary) in Sumter County, AL. Capacity on Segment 440 is reduced by 500…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SO CO/SNG PLANT MCINTOSH EFFINGHAM (Georgia Power Co) (Southern Natural Gas loc 600081) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/sng/600081/