Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

SO CO/SNG PLANT MCDONOUGH COBB (Georgia Power Co)

Southern Natural Gas · Loc 50074 · Fulton County (WRI geocode; meter says Cobb -- see note), GA
Power plant delivery · counted in Power Generation · owner Georgia Power Co
Gas day Nov 27
0.386
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.396
Bcf/d
30-day average
0.319
30 of 30 days posted
30-day high
0.422
Nov 22
30-day low
0.082
Oct 29
Operating capacity
0.730
Bcf/d as posted, evening cycle
Utilization
53%
headroom 47%

Scheduled quantities as posted by Southern Natural Gas on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.200.400.60Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.386+0.000
Nov 260.386-0.024
Nov 250.410+0.009
Nov 240.401+0.018
Nov 230.383-0.039
Nov 220.422+0.040
Nov 210.382+0.033
Nov 200.349+0.004
Nov 190.345-0.032
Nov 180.377+0.002
Nov 170.375-0.045
Nov 160.420+0.081
Nov 150.338-0.005
Nov 140.343+0.031
Nov 130.312+0.052
Nov 120.260+0.000
Nov 110.260-0.015
Nov 100.275-0.010
Nov 90.284-0.053
Nov 80.337+0.049
Nov 70.288+0.052
Nov 60.236-0.067
Nov 50.303+0.003
Nov 40.301+0.001
Nov 30.299+0.029
Nov 20.271+0.029
Nov 10.241-0.005
Oct 310.246+0.000
Oct 300.246+0.164
Oct 290.082—
70 more days on file for this meter, back to August 20, 2026. Full meter-level history is part of Institutional (API and downloads).
Southern Natural GasSO CO/SNG PLANT MCDONOUGH COBB (Georgia Power Co)

Southern Natural GasPlant location from EIA Form 860 (plant 710).

Recent notices on Southern Natural Gas

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Southern Natural Gas notices →

Southern Natural Gas · posted 2026-11-23 · effective 2026-11-23 · informational
Southern Natural Gas · posted 2026-11-23 · effective 2026-11-22 · force majeure
Southern Natural Gas declared force majeure effective gas day November 22, 2026 due to an unscheduled pipeline outage on the South Main Loop Line east of the York compressor station (Segment 440, Zone 1/2 S Boundary) in Sumter County, AL. Capacity on Segment 440 is reduced by 500…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SO CO/SNG PLANT MCDONOUGH COBB (Georgia Power Co) (Southern Natural Gas loc 50074) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/sng/50074/