Gas day Nov 27
0.178
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.061
Bcf/d
30-day average
0.193
30 of 30 days posted
30-day high
0.269
Oct 31
30-day low
0.013
Nov 24
Operating capacity
0.472
Bcf/d as posted, evening cycle
Utilization
38%
headroom 62%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.178+0.000
Nov 260.178+0.160
Nov 250.017+0.004
Nov 240.013-0.001
Nov 230.014+0.000
Nov 220.014+0.000
Nov 210.014+0.001
Nov 200.013-0.244
Nov 190.257+0.001
Nov 180.256+0.010
Nov 170.246+0.021
Nov 160.225-0.004
Nov 150.229-0.001
Nov 140.230-0.018
Nov 130.248-0.005
Nov 120.253+0.000
Nov 110.253+0.011
Nov 100.242+0.002
Nov 90.241+0.022
Nov 80.219-0.003
Nov 70.222-0.027
Nov 60.249+0.023
Nov 50.227+0.031
Nov 40.196-0.055
Nov 30.251-0.011
Nov 20.262+0.002
Nov 10.260-0.009
Oct 310.269+0.011
Oct 300.258-0.005
Oct 290.262—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest Pipeline

Northwest PipelineState only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.