Gas day Nov 27
0.038
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.043
Bcf/d
30-day average
0.027
30 of 30 days posted
30-day high
0.072
Nov 19
30-day low
0.000
Nov 16
Operating capacity
0.380
Bcf/d as posted, evening cycle
Utilization
10%
headroom 90%
Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.038 | +0.000 |
| Nov 26 | 0.038 | -0.003 |
| Nov 25 | 0.042 | +0.018 |
| Nov 24 | 0.024 | -0.009 |
| Nov 23 | 0.033 | -0.030 |
| Nov 22 | 0.063 | +0.000 |
| Nov 21 | 0.063 | +0.023 |
| Nov 20 | 0.040 | -0.032 |
| Nov 19 | 0.072 | +0.064 |
| Nov 18 | 0.008 | +0.004 |
| Nov 17 | 0.004 | +0.004 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | +0.000 |
| Nov 12 | 0.000 | -0.006 |
| Nov 11 | 0.006 | -0.020 |
| Nov 10 | 0.026 | +0.007 |
| Nov 9 | 0.019 | -0.029 |
| Nov 8 | 0.048 | -0.006 |
| Nov 7 | 0.055 | +0.043 |
| Nov 6 | 0.012 | -0.020 |
| Nov 5 | 0.031 | -0.022 |
| Nov 4 | 0.053 | +0.030 |
| Nov 3 | 0.023 | +0.003 |
| Nov 2 | 0.020 | -0.013 |
| Nov 1 | 0.033 | +0.012 |
| Oct 31 | 0.021 | +0.000 |
| Oct 30 | 0.021 | -0.000 |
| Oct 29 | 0.021 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Northwest PipelineState only (Wyoming) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Northwest Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →
Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Northwest Pipeline
- IGNACIO PLANT 0.178 Bcf/d
- CORRAL RECEIPT 0.057 Bcf/d
- DRAGON TRAIL 0.050 Bcf/d
- GREEN RIVER GATHERING 0.036 Bcf/d
- FLORIDA RIVER 0.019 Bcf/d
- CASSIA RNG RECEIPT 0.002 Bcf/d
- CALF CANYON/LFC 0.002 Bcf/d
- CHEVRON RANGELY -0.001 Bcf/d
Cite thisEnercast PipeScrape, FRONTIER (PIONEER GAS PROCESSING) (Northwest Pipeline loc 158811) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northwest/158811/