FRONTIER (PIONEER GAS PROCESSING)

Northwest Pipeline · Loc 158811 · Wyoming
Processing plant · counted in Supply / Production
Gas day Nov 27
0.038
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.043
Bcf/d
30-day average
0.027
30 of 30 days posted
30-day high
0.072
Nov 19
30-day low
0.000
Nov 16
Operating capacity
0.380
Bcf/d as posted, evening cycle
Utilization
10%
headroom 90%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.038+0.000
Nov 260.038-0.003
Nov 250.042+0.018
Nov 240.024-0.009
Nov 230.033-0.030
Nov 220.063+0.000
Nov 210.063+0.023
Nov 200.040-0.032
Nov 190.072+0.064
Nov 180.008+0.004
Nov 170.004+0.004
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000-0.006
Nov 110.006-0.020
Nov 100.026+0.007
Nov 90.019-0.029
Nov 80.048-0.006
Nov 70.055+0.043
Nov 60.012-0.020
Nov 50.031-0.022
Nov 40.053+0.030
Nov 30.023+0.003
Nov 20.020-0.013
Nov 10.033+0.012
Oct 310.021+0.000
Oct 300.021-0.000
Oct 290.021—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest Pipeline

Northwest PipelineState only (Wyoming) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, FRONTIER (PIONEER GAS PROCESSING) (Northwest Pipeline loc 158811) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northwest/158811/