Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Enstor Katy Fort Bend (NGPL interconnect) (withdrawal, Natural Gas Pipeline (NGPL))

Natural Gas Pipeline (NGPL) · Loc 908197 · Gulf Coast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
+0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.000
Bcf/d
30-day average
+0.004
30 of 30 days posted
30-day high
+0.025
Nov 9
30-day low
+0.000
Nov 27
Operating capacity
0.300
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.000+0.000
Nov 26+0.000+0.000
Nov 25+0.000+0.000
Nov 24+0.000+0.000
Nov 23+0.000+0.000
Nov 22+0.000+0.000
Nov 21+0.000+0.000
Nov 20+0.000+0.000
Nov 19+0.000+0.000
Nov 18+0.000+0.000
Nov 17+0.000+0.000
Nov 16+0.000+0.000
Nov 15+0.000+0.000
Nov 14+0.000+0.000
Nov 13+0.000+0.000
Nov 12+0.000+0.000
Nov 11+0.000+0.000
Nov 10+0.000-0.025
Nov 9+0.025+0.000
Nov 8+0.025+0.000
Nov 7+0.025+0.025
Nov 6+0.000-0.000
Nov 5+0.000-0.001
Nov 4+0.001-0.004
Nov 3+0.005-0.017
Nov 2+0.022+0.019
Nov 1+0.003+0.003
Oct 31+0.000+0.000
Oct 30+0.000+0.000
Oct 29+0.000—
86 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)

Natural Gas Pipeline (NGPL)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Enstor Katy Fort Bend (NGPL interconnect) (withdrawal, Natural Gas Pipeline (NGPL)) (Natural Gas Pipeline (NGPL) loc 908197) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ngpl/908197/