Enercast — at the moment it matters
Home / Daily Summary / LNG Feedgas / Meter

Sabine Pass -- NGPL direct leg

Natural Gas Pipeline (NGPL) · Loc 46622 · Gulf Coast
LNG feed-gas delivery · counted in LNG Feedgas
Gas day Nov 26
0.996
Bcf/d scheduled
Δ Day-over-day
+0.025
vs Nov 25
7-day average
0.914
Bcf/d
30-day average
0.855
30 of 30 days posted
30-day high
0.996
Nov 26
30-day low
0.712
Oct 28
Operating capacity
1.100
Bcf/d as posted, evening cycle
Utilization
91%
headroom 9%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LNG Feedgas page.

0.000.250.500.751.00Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.996+0.025
Nov 250.971+0.088
Nov 240.883-0.088
Nov 230.971+0.101
Nov 220.870+0.004
Nov 210.866+0.025
Nov 200.841+0.069
Nov 190.771-0.175
Nov 180.947+0.163
Nov 170.783-0.111
Nov 160.894-0.006
Nov 150.900-0.029
Nov 140.929+0.028
Nov 130.901+0.016
Nov 120.885-0.016
Nov 110.901+0.124
Nov 100.777-0.007
Nov 90.784-0.110
Nov 80.894+0.003
Nov 70.891+0.041
Nov 60.850+0.006
Nov 50.844-0.068
Nov 40.912+0.003
Nov 30.909+0.127
Nov 20.783-0.017
Nov 10.799+0.062
Oct 310.737+0.009
Oct 300.728+0.008
Oct 290.721+0.009
Oct 280.712—
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)Sabine Pass -- NGPL direct leg

Natural Gas Pipeline (NGPL)Placed at the Sabine LNG terminal; approximate. The meter itself sits on the feed-gas line into the terminal.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Sabine Pass -- NGPL direct leg (Natural Gas Pipeline (NGPL) loc 46622) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/46622/