Houston Aggregate

Gulf South Pipeline · Loc 6640 · HARRIS, Texas
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.005
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 25
7-day average
0.010
Bcf/d
30-day average
0.005
30 of 30 days posted
30-day high
0.028
Nov 1
30-day low
0.000
Nov 19
Operating capacity
0.099
Bcf/d as posted, eve cycle
Utilization
5%
headroom 95%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.005+0.004
Nov 250.001-0.002
Nov 240.003-0.012
Nov 230.015+0.000
Nov 220.015-0.005
Nov 210.019+0.005
Nov 200.015+0.015
Nov 190.000-0.014
Nov 180.014+0.010
Nov 170.004+0.001
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003+0.002
Nov 130.001+0.001
Nov 120.000+0.000
Nov 110.000-0.002
Nov 100.002+0.002
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000-0.002
Nov 50.002+0.001
Nov 40.001-0.002
Nov 30.004+0.004
Nov 20.000-0.028
Nov 10.028+0.028
Oct 310.001+0.001
Oct 300.000-0.000
Oct 290.000-0.007
Oct 280.008—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineHouston Aggregate

Gulf South PipelinePlaced at the center of Harris, TX — approximate; the exact meter site is not published.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Houston Aggregate (Gulf South Pipeline loc 6640) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/6640/