Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

Southwest La Aggregate 06

Gulf South Pipeline · Loc 6624 · CALCASIEU, Louisiana
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.014
Bcf/d scheduled
Δ Day-over-day
+0.009
vs Nov 25
7-day average
0.008
Bcf/d
30-day average
0.008
30 of 30 days posted
30-day high
0.015
Nov 19
30-day low
0.003
Nov 4
Operating capacity
0.109
Bcf/d as posted, eve cycle
Utilization
13%
headroom 87%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.015Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.014+0.009
Nov 250.005+0.000
Nov 240.004-0.003
Nov 230.007+0.000
Nov 220.007+0.000
Nov 210.007-0.003
Nov 200.010-0.005
Nov 190.015+0.010
Nov 180.004-0.000
Nov 170.004+0.000
Nov 160.004+0.000
Nov 150.004+0.000
Nov 140.004-0.003
Nov 130.007+0.003
Nov 120.004+0.000
Nov 110.004+0.000
Nov 100.004-0.010
Nov 90.014+0.000
Nov 80.014+0.000
Nov 70.014+0.010
Nov 60.004-0.003
Nov 50.007+0.004
Nov 40.003-0.002
Nov 30.005-0.009
Nov 20.014+0.000
Nov 10.014+0.006
Oct 310.008-0.001
Oct 300.009-0.002
Oct 290.011+0.006
Oct 280.005—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineSouthwest La Aggregate 06

Gulf South PipelinePlaced at the center of Calcasieu, LA — approximate; the exact meter site is not published.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Southwest La Aggregate 06 (Gulf South Pipeline loc 6624) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/6624/