Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

Whistler Junction (To Mobile Gas)

Gulf South Pipeline · Loc 20776 · MOBILE, Alabama
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.066
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.048
Bcf/d
30-day average
0.043
30 of 30 days posted
30-day high
0.066
Nov 27
30-day low
0.025
Nov 3
Operating capacity
0.189
Bcf/d as posted, eve cycle
Utilization
35%
headroom 65%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.066+0.000
Nov 260.066+0.000
Nov 250.066+0.006
Nov 240.060+0.035
Nov 230.025+0.000
Nov 220.025+0.000
Nov 210.025+0.000
Nov 200.025-0.020
Nov 190.045+0.012
Nov 180.033-0.032
Nov 170.065+0.037
Nov 160.028-0.020
Nov 150.048+0.000
Nov 140.048-0.008
Nov 130.056-0.003
Nov 120.059+0.006
Nov 110.053-0.008
Nov 100.061+0.032
Nov 90.029+0.000
Nov 80.029+0.000
Nov 70.029+0.000
Nov 60.029+0.000
Nov 50.029+0.000
Nov 40.029+0.004
Nov 30.025-0.004
Nov 20.029-0.008
Nov 10.037-0.026
Oct 310.063+0.000
Oct 300.063+0.018
Oct 290.045—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineWhistler Junction (To Mobile Gas)

Gulf South PipelinePlaced at the center of Mobile, AL — approximate; the exact meter site is not published.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational