VENICE PLT (FROM TARGA MIDSTREAM)

Gulf South Pipeline · Loc 464 · Louisiana
Processing plant · counted in Supply / Production
Gas day Nov 26
0.077
Bcf/d scheduled
Δ Day-over-day
+0.049
vs Nov 25
7-day average
0.042
Bcf/d
30-day average
0.060
30 of 30 days posted
30-day high
0.102
Nov 10
30-day low
0.028
Nov 25
Operating capacity
0.235
Bcf/d as posted, eve cycle
Utilization
33%
headroom 67%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.077+0.049
Nov 250.028-0.007
Nov 240.035+0.000
Nov 230.035-0.000
Nov 220.036+0.000
Nov 210.036-0.009
Nov 200.045-0.011
Nov 190.056-0.001
Nov 180.056-0.020
Nov 170.076+0.005
Nov 160.071-0.003
Nov 150.074-0.008
Nov 140.081-0.012
Nov 130.093+0.039
Nov 120.054-0.037
Nov 110.091-0.011
Nov 100.102+0.038
Nov 90.064-0.010
Nov 80.074+0.010
Nov 70.064-0.005
Nov 60.069+0.010
Nov 50.058-0.007
Nov 40.065+0.014
Nov 30.051-0.003
Nov 20.055+0.015
Nov 10.040-0.020
Oct 310.060+0.000
Oct 300.060+0.000
Oct 290.060+0.013
Oct 280.046—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Gulf South Pipeline · posted 2026-11-12 · effective 2026-11-12 · informational
Gulf South Pipeline · posted 2026-11-12 · effective 2026-11-12 · informational
Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, VENICE PLT (FROM TARGA MIDSTREAM) (Gulf South Pipeline loc 464) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/464/