Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Gemini Panola County Tx (Expansion)

Gulf South Pipeline · Loc 24446 · Texas
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.136
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
0.137
Bcf/d
30-day average
0.137
30 of 30 days posted
30-day high
0.153
Nov 5
30-day low
0.119
Oct 29
Operating capacity
0.733
Bcf/d as posted, eve cycle
Utilization
19%
headroom 81%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.136+0.001
Nov 250.135+0.014
Nov 240.121-0.022
Nov 230.143+0.001
Nov 220.142-0.002
Nov 210.143+0.007
Nov 200.137+0.000
Nov 190.137+0.003
Nov 180.134+0.001
Nov 170.133-0.000
Nov 160.133+0.000
Nov 150.133+0.000
Nov 140.133+0.008
Nov 130.126-0.012
Nov 120.137-0.001
Nov 110.138+0.000
Nov 100.138-0.007
Nov 90.145+0.000
Nov 80.145-0.000
Nov 70.145-0.007
Nov 60.152-0.001
Nov 50.153+0.017
Nov 40.137+0.008
Nov 30.128-0.010
Nov 20.138+0.000
Nov 10.138-0.002
Oct 310.140+0.000
Oct 300.140+0.022
Oct 290.119-0.003
Oct 280.121—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Gemini Panola County Tx (Expansion) (Gulf South Pipeline loc 24446) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/24446/