Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

COASTAL BEND ENTERPRISE INTERCONNECT

Gulf South Pipeline · Loc 23376 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.691
Bcf/d scheduled
Δ Day-over-day
-0.009
vs Nov 25
7-day average
0.674
Bcf/d
30-day average
0.597
30 of 30 days posted
30-day high
0.754
Nov 17
30-day low
0.178
Nov 1
Operating capacity
0.850
Bcf/d as posted, eve cycle
Utilization
81%
headroom 19%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.600.80Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.691-0.009
Nov 250.700-0.008
Nov 240.707+0.066
Nov 230.641+0.000
Nov 220.641+0.000
Nov 210.641-0.052
Nov 200.693+0.002
Nov 190.691-0.022
Nov 180.713-0.041
Nov 170.754+0.025
Nov 160.729-0.000
Nov 150.729+0.000
Nov 140.729-0.010
Nov 130.739+0.015
Nov 120.724+0.048
Nov 110.676-0.007
Nov 100.684+0.041
Nov 90.642+0.000
Nov 80.642+0.000
Nov 70.642+0.077
Nov 60.565+0.041
Nov 50.524+0.115
Nov 40.409+0.143
Nov 30.267+0.067
Nov 20.200+0.022
Nov 10.178-0.379
Oct 310.557+0.118
Oct 300.439-0.086
Oct 290.525+0.094
Oct 280.431—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Gulf South Pipeline · posted 2026-09-22 · effective 2026-09-21 · informational
Gulf South Pipeline · posted 2026-09-10 · effective 2026-09-10 · informational
Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, COASTAL BEND ENTERPRISE INTERCONNECT (Gulf South Pipeline loc 23376) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/23376/