Aethon Hwy 5 (Expansion)

Gulf South Pipeline · Loc 24424 · Louisiana
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.049
Bcf/d scheduled
Δ Day-over-day
+0.024
vs Nov 25
7-day average
0.059
Bcf/d
30-day average
0.064
30 of 30 days posted
30-day high
0.097
Nov 4
30-day low
0.025
Nov 25
Operating capacity
0.184
Bcf/d as posted, eve cycle
Utilization
27%
headroom 73%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.049+0.024
Nov 250.025-0.040
Nov 240.065-0.006
Nov 230.071-0.004
Nov 220.075-0.003
Nov 210.077+0.023
Nov 200.054-0.001
Nov 190.055+0.010
Nov 180.045-0.046
Nov 170.092+0.025
Nov 160.067+0.025
Nov 150.042+0.000
Nov 140.042-0.006
Nov 130.048-0.023
Nov 120.071+0.000
Nov 110.071-0.010
Nov 100.081+0.006
Nov 90.075+0.002
Nov 80.073+0.000
Nov 70.073+0.044
Nov 60.029-0.022
Nov 50.051-0.046
Nov 40.097+0.039
Nov 30.058-0.001
Nov 20.058+0.000
Nov 10.058-0.005
Oct 310.063-0.018
Oct 300.081+0.001
Oct 290.080-0.003
Oct 280.082—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Aethon Hwy 5 (Expansion) (Gulf South Pipeline loc 24424) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/24424/