Gulf South Pipeline · Loc 23992 · ST BERNARD, Louisiana
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.005
Bcf/d scheduled
Δ Day-over-day
-0.007
vs Nov 25
7-day average
0.011
Bcf/d
30-day average
0.008
30 of 30 days posted
30-day high
0.012
Nov 25
30-day low
0.000
Nov 9

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.015Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.005-0.007
Nov 250.012+0.000
Nov 240.012+0.000
Nov 230.012+0.000
Nov 220.012+0.000
Nov 210.012+0.000
Nov 200.012+0.000
Nov 190.012+0.000
Nov 180.012+0.000
Nov 170.012+0.000
Nov 160.012+0.000
Nov 150.012+0.000
Nov 140.012+0.001
Nov 130.011-0.001
Nov 120.011+0.000
Nov 110.011+0.000
Nov 100.011+0.011
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000-0.004
Nov 60.004+0.004
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000-0.010
Oct 310.010+0.000
Oct 300.010+0.005
Oct 290.005-0.005
Oct 280.010—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineNOPS

Gulf South PipelinePlaced at the center of St Bernard, LA — approximate; the exact meter site is not published.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NOPS (Gulf South Pipeline loc 23992) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/23992/