0.009
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.009
Bcf/d
30-day average
0.008
30 of 30 days posted
30-day high
0.009
Nov 19
30-day low
0.002
Nov 5
Operating capacity
0.048
Bcf/d as posted, eve cycle
Utilization
19%
headroom 81%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0030.0050.0070.010Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.009+0.000
Nov 260.009+0.000
Nov 250.009+0.000
Nov 240.009+0.000
Nov 230.009+0.000
Nov 220.009+0.000
Nov 210.009+0.000
Nov 200.009-0.000
Nov 190.009+0.000
Nov 180.009+0.000
Nov 170.009+0.000
Nov 160.009+0.000
Nov 150.009+0.000
Nov 140.009+0.000
Nov 130.009-0.000
Nov 120.009+0.000
Nov 110.009+0.000
Nov 100.009+0.000
Nov 90.009+0.000
Nov 80.009+0.000
Nov 70.009+0.000
Nov 60.009+0.007
Nov 50.002+0.000
Nov 40.002+0.000
Nov 30.002-0.003
Nov 20.005+0.000
Nov 10.005-0.001
Oct 310.006-0.001
Oct 300.007-0.002
Oct 290.009—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Football Cp - Haynesville Gathering (Gulf South Pipeline loc 22701) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/22701/