Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

MAGNOLIA CDP (CEFS)

Gulf South Pipeline · Loc 22622 · Louisiana
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.064
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.064
Bcf/d
30-day average
0.064
30 of 30 days posted
30-day high
0.079
Nov 16
30-day low
0.061
Oct 28
Operating capacity
0.647
Bcf/d as posted, eve cycle
Utilization
10%
headroom 90%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.0600.080Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.064+0.000
Nov 250.064+0.000
Nov 240.064+0.000
Nov 230.064+0.000
Nov 220.064+0.000
Nov 210.064+0.002
Nov 200.062+0.000
Nov 190.062+0.000
Nov 180.062+0.000
Nov 170.062-0.017
Nov 160.079+0.000
Nov 150.079+0.000
Nov 140.079+0.009
Nov 130.070+0.006
Nov 120.064+0.000
Nov 110.064-0.001
Nov 100.064+0.000
Nov 90.064+0.000
Nov 80.064+0.000
Nov 70.064+0.003
Nov 60.061+0.000
Nov 50.061+0.000
Nov 40.061+0.000
Nov 30.061+0.000
Nov 20.061+0.000
Nov 10.061-0.000
Oct 310.061+0.000
Oct 300.061+0.000
Oct 290.061+0.001
Oct 280.061—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MAGNOLIA CDP (CEFS) (Gulf South Pipeline loc 22622) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/22622/