Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.004
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.034
Nov 4
30-day low
0.000
Nov 17
Operating capacity
0.389
Bcf/d as posted, eve cycle
Utilization
0%
headroom 100%
Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.000 | +0.000 |
| Nov 25 | 0.000 | +0.000 |
| Nov 24 | 0.000 | +0.000 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | -0.025 |
| Nov 20 | 0.025 | +0.015 |
| Nov 19 | 0.010 | +0.010 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | -0.002 |
| Nov 12 | 0.002 | +0.000 |
| Nov 11 | 0.002 | +0.002 |
| Nov 10 | 0.000 | -0.006 |
| Nov 9 | 0.006 | -0.003 |
| Nov 8 | 0.008 | -0.003 |
| Nov 7 | 0.011 | +0.011 |
| Nov 6 | 0.000 | +0.000 |
| Nov 5 | 0.000 | -0.034 |
| Nov 4 | 0.034 | +0.034 |
| Nov 3 | 0.000 | +0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | -0.001 |
| Oct 31 | 0.001 | +0.000 |
| Oct 30 | 0.001 | +0.000 |
| Oct 29 | 0.001 | +0.000 |
| Oct 28 | 0.001 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Gulf South PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Gulf South Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →
Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Gulf South Pipeline
- COASTAL BEND ENTERPRISE INTERCONNECT 0.691 Bcf/d
- Sherman (From Enterprise) 0.599 Bcf/d
- BLAND LAKE-KUDU 0.304 Bcf/d
- Bulldog Panola (Bta Egt Gathering) 0.252 Bcf/d
- PLANTATION WEST II - EXPANSION 0.229 Bcf/d
- Bennington (From Enable Ok) 0.195 Bcf/d
- Plantation West Cp (Kinderhawk) 0.174 Bcf/d
- Gemini Panola County Tx (Expansion) 0.136 Bcf/d
Cite thisEnercast PipeScrape, STATELINE GATHERING SYSTEM (Gulf South Pipeline loc 22511) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/22511/