Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Bta Plant Rec - Carthage (Expansion)

Gulf South Pipeline · Loc 22171 · Texas
Processing plant · counted in Supply / Production
Gas day Nov 26
0.031
Bcf/d scheduled
Δ Day-over-day
-0.006
vs Nov 25
7-day average
0.040
Bcf/d
30-day average
0.031
30 of 30 days posted
30-day high
0.054
Nov 6
30-day low
0.012
Oct 29
Operating capacity
0.172
Bcf/d as posted, eve cycle
Utilization
18%
headroom 82%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.031-0.006
Nov 250.037-0.006
Nov 240.043+0.001
Nov 230.043+0.001
Nov 220.041-0.001
Nov 210.042-0.000
Nov 200.042+0.018
Nov 190.024-0.007
Nov 180.031-0.010
Nov 170.041-0.001
Nov 160.042+0.000
Nov 150.042+0.000
Nov 140.042+0.003
Nov 130.039+0.023
Nov 120.016+0.001
Nov 110.015-0.028
Nov 100.044+0.010
Nov 90.034+0.003
Nov 80.032-0.003
Nov 70.034-0.019
Nov 60.054+0.012
Nov 50.042+0.010
Nov 40.031+0.011
Nov 30.020+0.003
Nov 20.017+0.004
Nov 10.012-0.002
Oct 310.014+0.001
Oct 300.014+0.002
Oct 290.012-0.002
Oct 280.014—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.