Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

DCP EAST TEXAS PLANT (EXPANSION AREA 16)

Gulf South Pipeline · Loc 22124 · Texas
Processing plant · counted in Supply / Production
Gas day Nov 26
0.043
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 25
7-day average
0.040
Bcf/d
30-day average
0.040
30 of 30 days posted
30-day high
0.061
Oct 31
30-day low
0.034
Nov 14
Operating capacity
0.486
Bcf/d as posted, eve cycle
Utilization
9%
headroom 91%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.0600.080Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.043+0.004
Nov 250.039+0.001
Nov 240.039-0.001
Nov 230.040-0.000
Nov 220.041-0.000
Nov 210.041+0.006
Nov 200.034-0.001
Nov 190.035+0.001
Nov 180.034+0.000
Nov 170.034+0.000
Nov 160.034-0.001
Nov 150.034+0.001
Nov 140.034-0.001
Nov 130.034+0.001
Nov 120.034+0.000
Nov 110.034-0.000
Nov 100.034-0.006
Nov 90.040+0.001
Nov 80.039-0.001
Nov 70.040+0.003
Nov 60.037+0.000
Nov 50.037+0.000
Nov 40.037-0.000
Nov 30.037+0.000
Nov 20.037+0.000
Nov 10.036-0.025
Oct 310.061+0.005
Oct 300.056+0.002
Oct 290.054-0.003
Oct 280.058—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DCP EAST TEXAS PLANT (EXPANSION AREA 16) (Gulf South Pipeline loc 22124) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/22124/