Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ENERGY TRANSFER - CARTHAGE (EXPANSION)

Gulf South Pipeline · Loc 21922 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.107
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 26
7-day average
0.109
Bcf/d
30-day average
0.109
30 of 30 days posted
30-day high
0.149
Nov 19
30-day low
0.052
Oct 31
Operating capacity
1.823
Bcf/d as posted, eve cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.107-0.001
Nov 260.108-0.003
Nov 250.111+0.003
Nov 240.108+0.000
Nov 230.108-0.001
Nov 220.109+0.000
Nov 210.109-0.025
Nov 200.134-0.015
Nov 190.149+0.011
Nov 180.138+0.012
Nov 170.126+0.017
Nov 160.108+0.000
Nov 150.108+0.000
Nov 140.108+0.005
Nov 130.103-0.005
Nov 120.108+0.000
Nov 110.108-0.000
Nov 100.108-0.009
Nov 90.117+0.000
Nov 80.117+0.000
Nov 70.117+0.009
Nov 60.108-0.012
Nov 50.121+0.012
Nov 40.109+0.006
Nov 30.102-0.027
Nov 20.130+0.001
Nov 10.128+0.076
Oct 310.052+0.000
Oct 300.052-0.001
Oct 290.053—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ENERGY TRANSFER - CARTHAGE (EXPANSION) (Gulf South Pipeline loc 21922) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/21922/