Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Midcoast - Carthage (Expansion)

Gulf South Pipeline · Loc 21921 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.106
Bcf/d scheduled
Δ Day-over-day
+0.011
vs Nov 25
7-day average
0.118
Bcf/d
30-day average
0.142
30 of 30 days posted
30-day high
0.211
Oct 29
30-day low
0.095
Nov 25
Operating capacity
0.361
Bcf/d as posted, eve cycle
Utilization
29%
headroom 71%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.106+0.011
Nov 250.095-0.023
Nov 240.118-0.005
Nov 230.123-0.003
Nov 220.126+0.003
Nov 210.123-0.009
Nov 200.133-0.022
Nov 190.155-0.004
Nov 180.158+0.014
Nov 170.144+0.014
Nov 160.130-0.001
Nov 150.131+0.000
Nov 140.131+0.002
Nov 130.129-0.027
Nov 120.156+0.000
Nov 110.156+0.003
Nov 100.153+0.024
Nov 90.130+0.000
Nov 80.130+0.000
Nov 70.129+0.004
Nov 60.125+0.015
Nov 50.110-0.055
Nov 40.165+0.035
Nov 30.130-0.033
Nov 20.163+0.047
Nov 10.116-0.091
Oct 310.207+0.010
Oct 300.197-0.015
Oct 290.211+0.016
Oct 280.196—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.