Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

EAST VERNON FIELD CP #1

Gulf South Pipeline · Loc 21828 · Louisiana
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.003
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.004
Bcf/d
30-day average
0.004
30 of 30 days posted
30-day high
0.009
Oct 28
30-day low
0.000
Oct 31
Operating capacity
0.046
Bcf/d as posted, eve cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0030.0050.0070.010Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.003-0.001
Nov 250.004+0.001
Nov 240.003-0.002
Nov 230.004-0.000
Nov 220.004-0.001
Nov 210.005+0.001
Nov 200.004-0.000
Nov 190.004+0.002
Nov 180.003-0.000
Nov 170.003+0.000
Nov 160.003-0.000
Nov 150.003-0.000
Nov 140.003-0.002
Nov 130.005+0.001
Nov 120.005-0.000
Nov 110.005+0.003
Nov 100.002+0.000
Nov 90.002-0.000
Nov 80.002-0.001
Nov 70.003-0.003
Nov 60.005-0.001
Nov 50.006+0.001
Nov 40.005-0.002
Nov 30.008+0.002
Nov 20.006-0.000
Nov 10.006+0.006
Oct 310.000-0.000
Oct 300.000-0.001
Oct 290.001-0.008
Oct 280.009—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, EAST VERNON FIELD CP #1 (Gulf South Pipeline loc 21828) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/21828/