Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Entergy Louisiana Baton Rouge Aggregate

Gulf South Pipeline · Loc 21365 · Louisiana
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.004
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
-0.004
Bcf/d
30-day average
-0.003
30 of 30 days posted
30-day high
-0.003
Nov 17
30-day low
-0.004
Nov 26
Operating capacity
0.026
Bcf/d as posted, eve cycle
Utilization
15%
headroom 85%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.004-0.003-0.002-0.0010.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.004+0.000
Nov 25-0.004+0.000
Nov 24-0.004+0.000
Nov 23-0.004+0.000
Nov 22-0.004+0.000
Nov 21-0.004+0.000
Nov 20-0.004+0.000
Nov 19-0.004+0.000
Nov 18-0.004-0.001
Nov 17-0.003+0.000
Nov 16-0.003+0.000
Nov 15-0.003+0.000
Nov 14-0.003+0.000
Nov 13-0.003+0.000
Nov 12-0.003+0.000
Nov 11-0.003+0.000
Nov 10-0.003+0.000
Nov 9-0.003+0.000
Nov 8-0.003+0.000
Nov 7-0.003+0.000
Nov 6-0.003+0.000
Nov 5-0.003+0.000
Nov 4-0.003+0.000
Nov 3-0.003+0.000
Nov 2-0.003+0.000
Nov 1-0.003+0.001
Oct 31-0.004+0.000
Oct 30-0.004+0.000
Oct 29-0.004+0.000
Oct 28-0.004—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.