Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Eastrans DCP Carthage GR

Gulf Run Transmission · Loc 220015 · Texas
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.045
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.059
Bcf/d
30-day average
0.057
30 of 30 days posted
30-day high
0.077
Nov 9
30-day low
0.010
Oct 31
Operating capacity
0.500
Bcf/d as posted, none cycle
Utilization
9%
headroom 91%

Scheduled quantities as posted by Gulf Run Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.045+0.000
Nov 260.045-0.015
Nov 250.060+0.002
Nov 240.058-0.010
Nov 230.068+0.000
Nov 220.068+0.000
Nov 210.068-0.008
Nov 200.076+0.021
Nov 190.054+0.009
Nov 180.045-0.024
Nov 170.069-0.004
Nov 160.073+0.000
Nov 150.073+0.000
Nov 140.073-0.003
Nov 130.076+0.024
Nov 120.052+0.000
Nov 110.052+0.014
Nov 100.037-0.040
Nov 90.077+0.001
Nov 80.077+0.012
Nov 70.065+0.015
Nov 60.050-0.026
Nov 50.076+0.020
Nov 40.056+0.000
Nov 30.056-0.011
Nov 20.067-0.004
Nov 10.071+0.061
Oct 310.010+0.000
Oct 300.010-0.005
Oct 290.015—
78 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf Run Transmission

Gulf Run TransmissionState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf Run Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf Run Transmission notices →

Gulf Run Transmission · posted 2026-11-25 · effective 2026-12-02 · force majeure
Gulf Run Transmission has declared force majeure for unplanned maintenance at its Vernon Compressor Station in Jackson Parish, Louisiana (Zone 1), effective December 2, 2026 at 9:00 a.m. and anticipated to complete by December 3, 2026 at 9:00 a.m. During this one-day window, thro…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Eastrans DCP Carthage GR (Gulf Run Transmission loc 220015) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfrun/220015/