Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

NMGASCO/EPNG (DODOEDEL) ODOE DELIVE

El Paso Natural Gas (EPNG) · Loc 48864 · SAN JUAN, New Mexico
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.051
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
0.050
Bcf/d
30-day average
0.046
30 of 30 days posted
30-day high
0.061
Nov 9
30-day low
0.034
Oct 31
Operating capacity
0.128
Bcf/d as posted, evening cycle
Utilization
39%
headroom 61%

Scheduled quantities as posted by El Paso Natural Gas (EPNG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.0600.080Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.051+0.001
Nov 250.050+0.001
Nov 240.049-0.000
Nov 230.049+0.000
Nov 220.049+0.000
Nov 210.049-0.004
Nov 200.053-0.001
Nov 190.054+0.006
Nov 180.048+0.001
Nov 170.046+0.000
Nov 160.046+0.000
Nov 150.046+0.000
Nov 140.046+0.000
Nov 130.046-0.000
Nov 120.046+0.000
Nov 110.046-0.000
Nov 100.046-0.014
Nov 90.061+0.015
Nov 80.046-0.010
Nov 70.056+0.010
Nov 60.046+0.001
Nov 50.045+0.003
Nov 40.043+0.004
Nov 30.039-0.000
Nov 20.039+0.001
Nov 10.039+0.004
Oct 310.034-0.005
Oct 300.040+0.000
Oct 290.040+0.000
Oct 280.040—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
El Paso Natural GasNMGASCO/EPNG (DODOEDEL) ODOE DELIVE

El Paso Natural GasPlaced at the center of San Juan, NM — approximate; the exact meter site is not published.

Recent notices on El Paso Natural Gas (EPNG)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All El Paso Natural Gas (EPNG) notices →

El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · force majeure
EPNG has declared force majeure at Laguna Compressor Station in Cibola County, New Mexico following a compressor gasket leak. The station is unavailable while repairs are completed, reducing operational capacity through the CAPROCK N constraint by 77,194 Dth/d (0.077 Bcf/d) effec…
El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-04 · effective 2026-11-04 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-03 · effective 2026-11-03 · force majeure
EPNG declared force majeure at Lincoln Compressor Station in Lincoln County, New Mexico due to a flame detection failure. This Update #1 escalates the capacity reduction through the CAPROCK N constraint from 214,491 Dth/d to 274,843 Dth/d (~0.275 Bcf/d), effective Intraday 1 Cycl…
El Paso Natural Gas (EPNG) · posted 2026-10-31 · effective 2026-10-31 · force majeure
EPNG has declared force majeure at its Roswell Compressor Station in Chaves County, New Mexico, following a turbo thrust bearing failure that has taken the station fully offline. Operational capacity through the CAPROCK N constraint will be reduced by 175,228 Dth/d (0.175 Bcf/d) …
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Force Majeure Update #2 on Line No. 1600 (third-party line strike downstream of Waha Compressor Station, Reeves County TX) adds the WA CORN scheduling constraint to zero net capacity effective Intraday 1 Cycle (Cycle 3) on October 29, 2026, joining previously zeroed Imperial…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Update #1 on the Line 1600 third-party line strike downstream of Waha Compressor Station in Reeves County, TX: the repair now requires full pipeline replacement rather than a simple pressure restriction. Two additional point locations -- Imperial Receipt/Delivery (loc 58045)…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-28 · force majeure
EPNG has declared force majeure on Line No. 1600 downstream of Waha Compressor Station in Reeves County, TX following a third-party line strike. The L1600EST constraint is initially capped at 0.250 Bcf/d effective Intraday 3 Cycle on October 28, dropping to zero effective the Eve…