Gas day Nov 26
0.129
Bcf/d scheduled
Δ Day-over-day
+0.002
vs Nov 25
7-day average
0.125
Bcf/d
30-day average
0.105
30 of 30 days posted
30-day high
0.129
Nov 26
30-day low
0.087
Nov 4
Operating capacity
0.345
Bcf/d as posted, evening cycle
Utilization
37%
headroom 63%

Scheduled quantities as posted by El Paso Natural Gas (EPNG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.129+0.002
Nov 250.128+0.003
Nov 240.124-0.002
Nov 230.126-0.000
Nov 220.126-0.000
Nov 210.127+0.009
Nov 200.118-0.004
Nov 190.122+0.010
Nov 180.112+0.005
Nov 170.107-0.002
Nov 160.110+0.000
Nov 150.110-0.000
Nov 140.110+0.005
Nov 130.105+0.012
Nov 120.092+0.001
Nov 110.091-0.002
Nov 100.093+0.003
Nov 90.090+0.000
Nov 80.089-0.003
Nov 70.093+0.000
Nov 60.092-0.002
Nov 50.094+0.007
Nov 40.087-0.009
Nov 30.097-0.008
Nov 20.105-0.000
Nov 10.105+0.017
Oct 310.088-0.002
Oct 300.089-0.005
Oct 290.095-0.008
Oct 280.103—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
El Paso Natural GasSWG AZ/EPNG (DSWG PHW) SOUTHWEST GA

El Paso Natural GasPlaced at the center of Maricopa, AZ — approximate; the exact meter site is not published.

Recent notices on El Paso Natural Gas (EPNG)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All El Paso Natural Gas (EPNG) notices →

El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · force majeure
EPNG has declared force majeure at Laguna Compressor Station in Cibola County, New Mexico following a compressor gasket leak. The station is unavailable while repairs are completed, reducing operational capacity through the CAPROCK N constraint by 77,194 Dth/d (0.077 Bcf/d) effec…
El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-04 · effective 2026-11-04 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-03 · effective 2026-11-03 · force majeure
EPNG declared force majeure at Lincoln Compressor Station in Lincoln County, New Mexico due to a flame detection failure. This Update #1 escalates the capacity reduction through the CAPROCK N constraint from 214,491 Dth/d to 274,843 Dth/d (~0.275 Bcf/d), effective Intraday 1 Cycl…
El Paso Natural Gas (EPNG) · posted 2026-10-31 · effective 2026-10-31 · force majeure
EPNG has declared force majeure at its Roswell Compressor Station in Chaves County, New Mexico, following a turbo thrust bearing failure that has taken the station fully offline. Operational capacity through the CAPROCK N constraint will be reduced by 175,228 Dth/d (0.175 Bcf/d) …
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Force Majeure Update #2 on Line No. 1600 (third-party line strike downstream of Waha Compressor Station, Reeves County TX) adds the WA CORN scheduling constraint to zero net capacity effective Intraday 1 Cycle (Cycle 3) on October 29, 2026, joining previously zeroed Imperial…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Update #1 on the Line 1600 third-party line strike downstream of Waha Compressor Station in Reeves County, TX: the repair now requires full pipeline replacement rather than a simple pressure restriction. Two additional point locations -- Imperial Receipt/Delivery (loc 58045)…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-28 · force majeure
EPNG has declared force majeure on Line No. 1600 downstream of Waha Compressor Station in Reeves County, TX following a third-party line strike. The L1600EST constraint is initially capped at 0.250 Bcf/d effective Intraday 3 Cycle on October 28, dropping to zero effective the Eve…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SWG AZ/EPNG (DSWG PHW) SOUTHWEST GA (El Paso Natural Gas (EPNG) loc 301120) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/epng/301120/