EPNG/EPNG (IWILCOXD) WILLCOX DELIVE

El Paso Natural Gas (EPNG) · Loc 302080 · Cochise, Arizona
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.025
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 25
7-day average
0.027
Bcf/d
30-day average
0.018
30 of 30 days posted
30-day high
0.031
Nov 24
30-day low
0.000
Nov 18
Operating capacity
0.312
Bcf/d as posted, evening cycle
Utilization
8%
headroom 92%

Scheduled quantities as posted by El Paso Natural Gas (EPNG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.025-0.002
Nov 250.028-0.004
Nov 240.031+0.006
Nov 230.025+0.000
Nov 220.025+0.000
Nov 210.025+0.000
Nov 200.025-0.002
Nov 190.027+0.027
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000-0.001
Nov 100.001-0.024
Nov 90.025+0.001
Nov 80.024+0.000
Nov 70.024-0.001
Nov 60.025+0.002
Nov 50.023+0.005
Nov 40.018-0.003
Nov 30.021-0.008
Nov 20.029+0.000
Nov 10.029+0.000
Oct 310.029+0.000
Oct 300.029+0.008
Oct 290.021-0.002
Oct 280.023—
85 more days on file for this meter, back to August 4, 2026. Full meter-level history is part of Institutional (API and downloads).
El Paso Natural GasEPNG/EPNG (IWILCOXD) WILLCOX DELIVE

El Paso Natural GasPlaced at the center of Cochise, AZ — approximate; the exact meter site is not published.

Recent notices on El Paso Natural Gas (EPNG)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All El Paso Natural Gas (EPNG) notices →

El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · force majeure
EPNG has declared force majeure at Laguna Compressor Station in Cibola County, New Mexico following a compressor gasket leak. The station is unavailable while repairs are completed, reducing operational capacity through the CAPROCK N constraint by 77,194 Dth/d (0.077 Bcf/d) effec…
El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-04 · effective 2026-11-04 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-03 · effective 2026-11-03 · force majeure
EPNG declared force majeure at Lincoln Compressor Station in Lincoln County, New Mexico due to a flame detection failure. This Update #1 escalates the capacity reduction through the CAPROCK N constraint from 214,491 Dth/d to 274,843 Dth/d (~0.275 Bcf/d), effective Intraday 1 Cycl…
El Paso Natural Gas (EPNG) · posted 2026-10-31 · effective 2026-10-31 · force majeure
EPNG has declared force majeure at its Roswell Compressor Station in Chaves County, New Mexico, following a turbo thrust bearing failure that has taken the station fully offline. Operational capacity through the CAPROCK N constraint will be reduced by 175,228 Dth/d (0.175 Bcf/d) …
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Force Majeure Update #2 on Line No. 1600 (third-party line strike downstream of Waha Compressor Station, Reeves County TX) adds the WA CORN scheduling constraint to zero net capacity effective Intraday 1 Cycle (Cycle 3) on October 29, 2026, joining previously zeroed Imperial…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Update #1 on the Line 1600 third-party line strike downstream of Waha Compressor Station in Reeves County, TX: the repair now requires full pipeline replacement rather than a simple pressure restriction. Two additional point locations -- Imperial Receipt/Delivery (loc 58045)…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-28 · force majeure
EPNG has declared force majeure on Line No. 1600 downstream of Waha Compressor Station in Reeves County, TX following a third-party line strike. The L1600EST constraint is initially capped at 0.250 Bcf/d effective Intraday 3 Cycle on October 28, dropping to zero effective the Eve…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, EPNG/EPNG (IWILCOXD) WILLCOX DELIVE (El Paso Natural Gas (EPNG) loc 302080) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/epng/302080/