Gas day Nov 27
0.089
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 26
7-day average
0.092
Bcf/d
30-day average
0.083
30 of 30 days posted
30-day high
0.109
Nov 25
30-day low
0.055
Nov 5
Operating capacity
0.124
Bcf/d as posted, late_0005 cycle
Utilization
72%
headroom 28%
Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.089 | -0.001 |
| Nov 26 | 0.091 | -0.018 |
| Nov 25 | 0.109 | +0.009 |
| Nov 24 | 0.101 | +0.014 |
| Nov 23 | 0.087 | +0.002 |
| Nov 22 | 0.085 | -0.002 |
| Nov 21 | 0.086 | -0.011 |
| Nov 20 | 0.097 | +0.003 |
| Nov 19 | 0.094 | +0.019 |
| Nov 18 | 0.075 | -0.004 |
| Nov 17 | 0.080 | -0.015 |
| Nov 16 | 0.095 | +0.001 |
| Nov 15 | 0.094 | +0.000 |
| Nov 14 | 0.094 | -0.013 |
| Nov 13 | 0.107 | +0.026 |
| Nov 12 | 0.081 | -0.012 |
| Nov 11 | 0.093 | +0.014 |
| Nov 10 | 0.079 | +0.000 |
| Nov 9 | 0.079 | +0.014 |
| Nov 8 | 0.065 | -0.000 |
| Nov 7 | 0.065 | -0.002 |
| Nov 6 | 0.067 | +0.012 |
| Nov 5 | 0.055 | -0.010 |
| Nov 4 | 0.065 | -0.005 |
| Nov 3 | 0.070 | -0.006 |
| Nov 2 | 0.076 | +0.001 |
| Nov 1 | 0.075 | -0.008 |
| Oct 31 | 0.082 | +0.003 |
| Oct 30 | 0.080 | +0.005 |
| Oct 29 | 0.075 | — |
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Algonquin Gas TransmissionPlaced at the center of Middlesex, MA — approximate; the exact meter site is not published.
Notices
Recent notices on Algonquin Gas Transmission
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →
Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
SEV 4/5AGT Force Majeure
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on Algonquin Gas Transmission
- North Haven (NEW HAVEN) 0.076 Bcf/d
- Brockton (PLYMOUTH,MA) 0.064 Bcf/d
- National Grid-PONKAPOAG (NORFOLK,MA) 0.053 Bcf/d
- Rhode Island Energy -DEY ST. (PROVIDENCE,RI) 0.038 Bcf/d
- CROMWELL (MIDDLESEX,CT) 0.037 Bcf/d
- GLASTONBURY (HARTFORD,CT) 0.024 Bcf/d
- National Grid-WELLESLEY (NORFOLK,MA) 0.022 Bcf/d
- Westwood (NORFOLK, MA) 0.022 Bcf/d
Cite thisEnercast PipeScrape, Mystic (MIDDLESEX,MA) (Algonquin Gas Transmission loc 00826) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/algonquin/00826/