CROMWELL (MIDDLESEX,CT)

Algonquin Gas Transmission · Loc 00078 · Middlesex, Connecticut
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.037
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 25
7-day average
0.036
Bcf/d
30-day average
0.034
30 of 30 days posted
30-day high
0.043
Nov 24
30-day low
0.018
Nov 4
Operating capacity
0.082
Bcf/d as posted, late_0005 cycle
Utilization
46%
headroom 54%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.037-0.005
Nov 250.042-0.001
Nov 240.043+0.004
Nov 230.039+0.020
Nov 220.019-0.019
Nov 210.038-0.000
Nov 200.038-0.001
Nov 190.039+0.000
Nov 180.039-0.000
Nov 170.039+0.000
Nov 160.039+0.001
Nov 150.038-0.000
Nov 140.038-0.001
Nov 130.039+0.000
Nov 120.039+0.000
Nov 110.039+0.009
Nov 100.029-0.009
Nov 90.038+0.007
Nov 80.032+0.012
Nov 70.019+0.000
Nov 60.019-0.000
Nov 50.020+0.002
Nov 40.018-0.001
Nov 30.019-0.018
Nov 20.037+0.001
Nov 10.036-0.000
Oct 310.036-0.001
Oct 300.037+0.000
Oct 290.037-0.000
Oct 280.037—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionCROMWELL (MIDDLESEX,CT)

Algonquin Gas TransmissionPlaced at the center of Middlesex, CT — approximate; the exact meter site is not published.

Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CROMWELL (MIDDLESEX,CT) (Algonquin Gas Transmission loc 00078) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/algonquin/00078/