Westwood (NORFOLK, MA)

Algonquin Gas Transmission · Loc 00022 · NORFOLK, Massachusetts
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.022
Bcf/d scheduled
Δ Day-over-day
+0.013
vs Nov 26
7-day average
0.007
Bcf/d
30-day average
0.007
30 of 30 days posted
30-day high
0.029
Nov 12
30-day low
0.001
Nov 5
Operating capacity
0.056
Bcf/d as posted, late_0005 cycle
Utilization
40%
headroom 60%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.022+0.013
Nov 260.009-0.005
Nov 250.014+0.012
Nov 240.002+0.001
Nov 230.001+0.000
Nov 220.001+0.000
Nov 210.001+0.000
Nov 200.001+0.000
Nov 190.001-0.002
Nov 180.003-0.002
Nov 170.005-0.001
Nov 160.005+0.004
Nov 150.001-0.006
Nov 140.007+0.001
Nov 130.006-0.023
Nov 120.029+0.014
Nov 110.015+0.013
Nov 100.001-0.015
Nov 90.016+0.006
Nov 80.009+0.001
Nov 70.009+0.007
Nov 60.001+0.000
Nov 50.001-0.000
Nov 40.001+0.000
Nov 30.001+0.000
Nov 20.001-0.003
Nov 10.004-0.016
Oct 310.020+0.000
Oct 300.020+0.017
Oct 290.003—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionWestwood (NORFOLK, MA)

Algonquin Gas TransmissionPlaced at the center of Norfolk, MA — approximate; the exact meter site is not published.

Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Westwood (NORFOLK, MA) (Algonquin Gas Transmission loc 00022) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/algonquin/00022/