Gas day Nov 26
0.014
Bcf/d scheduled
Δ Day-over-day
-0.009
vs Nov 25
7-day average
0.022
Bcf/d
30-day average
0.016
30 of 30 days posted
30-day high
0.035
Nov 24
30-day low
0.007
Oct 29
Operating capacity
0.155
Bcf/d as posted, late_0005 cycle
Utilization
9%
headroom 91%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.014-0.009
Nov 250.023-0.012
Nov 240.035+0.008
Nov 230.027+0.011
Nov 220.017+0.000
Nov 210.017-0.003
Nov 200.019-0.005
Nov 190.024+0.001
Nov 180.023-0.001
Nov 170.024+0.002
Nov 160.022+0.000
Nov 150.022-0.000
Nov 140.022+0.000
Nov 130.022+0.004
Nov 120.018+0.000
Nov 110.018+0.001
Nov 100.017+0.008
Nov 90.010+0.001
Nov 80.009+0.000
Nov 70.009+0.001
Nov 60.008+0.000
Nov 50.008+0.000
Nov 40.008+0.000
Nov 30.007-0.008
Nov 20.015-0.000
Nov 10.015+0.006
Oct 310.009-0.000
Oct 300.009+0.002
Oct 290.007-0.004
Oct 280.011—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionMONTVILLE (NEW LONDON,CT)

Algonquin Gas TransmissionPlaced at the center of New London, CT — approximate; the exact meter site is not published.

Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MONTVILLE (NEW LONDON,CT) (Algonquin Gas Transmission loc 00059) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/algonquin/00059/