Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

Stony Point (ROCKLAND,NY)

Algonquin Gas Transmission · Loc 00040 · Rockland, New York
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.015
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 25
7-day average
0.013
Bcf/d
30-day average
0.010
30 of 30 days posted
30-day high
0.017
Nov 25
30-day low
0.002
Oct 31
Operating capacity
0.116
Bcf/d as posted, late_0005 cycle
Utilization
13%
headroom 87%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.0150.020Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.015-0.002
Nov 250.017+0.000
Nov 240.017+0.005
Nov 230.012+0.001
Nov 220.011+0.000
Nov 210.011-0.001
Nov 200.012-0.000
Nov 190.012+0.000
Nov 180.012-0.002
Nov 170.014-0.000
Nov 160.014+0.000
Nov 150.014+0.000
Nov 140.014+0.000
Nov 130.014+0.004
Nov 120.009+0.000
Nov 110.009-0.002
Nov 100.011+0.002
Nov 90.009+0.000
Nov 80.009+0.001
Nov 70.009+0.004
Nov 60.004+0.001
Nov 50.004-0.003
Nov 40.006-0.003
Nov 30.009+0.000
Nov 20.009-0.004
Nov 10.013+0.011
Oct 310.002+0.000
Oct 300.002+0.000
Oct 290.002+0.000
Oct 280.002—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionStony Point (ROCKLAND,NY)

Algonquin Gas TransmissionPlaced at the center of Rockland, NY — approximate; the exact meter site is not published.

Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Stony Point (ROCKLAND,NY) (Algonquin Gas Transmission loc 00040) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/algonquin/00040/