Algonquin Gas Transmission · Loc 00038 · Norfolk, Massachusetts
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.003
Nov 25
30-day low
0.000
Nov 27
Operating capacity
0.025
Bcf/d as posted, late_0005 cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0010.0020.003Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000-0.000
Nov 260.000-0.003
Nov 250.003+0.001
Nov 240.002+0.000
Nov 230.001+0.001
Nov 220.001-0.001
Nov 210.001-0.000
Nov 200.001+0.000
Nov 190.001-0.000
Nov 180.001-0.000
Nov 170.002-0.000
Nov 160.002+0.000
Nov 150.002+0.000
Nov 140.002+0.000
Nov 130.002+0.001
Nov 120.001-0.001
Nov 110.001+0.000
Nov 100.001-0.000
Nov 90.001+0.000
Nov 80.001+0.000
Nov 70.001+0.001
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000-0.000
Nov 20.000-0.000
Nov 10.001-0.001
Oct 310.002+0.000
Oct 300.001+0.001
Oct 290.001—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionCharles River RD (NORFOLK,MA)

Algonquin Gas TransmissionPlaced at the center of Norfolk, MA — approximate; the exact meter site is not published.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-11-01 · informational
Algonquin Gas Transmission · posted 2026-09-02 · effective 2026-09-01 · informational
Algonquin Gas Transmission · posted 2026-09-02 · effective 2026-09-01 · informational
Algonquin Gas Transmission · posted 2026-09-02 · effective 2026-09-01 · informational
Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Charles River RD (NORFOLK,MA) (Algonquin Gas Transmission loc 00038) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/algonquin/00038/