Rhode Island Energy- Portsmouth (NEWPORT,RI)

Algonquin Gas Transmission · Loc 00013 · NEWPORT, Rhode Island
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.018
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.013
Bcf/d
30-day average
0.013
30 of 30 days posted
30-day high
0.020
Nov 17
30-day low
0.006
Nov 22
Operating capacity
0.072
Bcf/d as posted, late_0005 cycle
Utilization
24%
headroom 76%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.018-0.001
Nov 250.018+0.002
Nov 240.017+0.006
Nov 230.011+0.004
Nov 220.006-0.004
Nov 210.011-0.002
Nov 200.013-0.001
Nov 190.014-0.003
Nov 180.017-0.003
Nov 170.020+0.000
Nov 160.020+0.000
Nov 150.020+0.000
Nov 140.020+0.000
Nov 130.020+0.007
Nov 120.013+0.000
Nov 110.013+0.001
Nov 100.012+0.002
Nov 90.010+0.001
Nov 80.009+0.000
Nov 70.008-0.001
Nov 60.009+0.001
Nov 50.008+0.000
Nov 40.008-0.004
Nov 30.012-0.000
Nov 20.012+0.000
Nov 10.012-0.000
Oct 310.013+0.000
Oct 300.013-0.001
Oct 290.013+0.001
Oct 280.012—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionRhode Island Energy- Portsmouth (NEWPORT,RI)

Algonquin Gas TransmissionPlaced at the center of Newport, RI — approximate; the exact meter site is not published.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-11-01 · informational
Algonquin Gas Transmission · posted 2026-09-02 · effective 2026-09-01 · informational
Algonquin Gas Transmission · posted 2026-09-02 · effective 2026-09-01 · informational
Algonquin Gas Transmission · posted 2026-09-02 · effective 2026-09-01 · informational
Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Rhode Island Energy- Portsmouth (NEWPORT,RI) (Algonquin Gas Transmission loc 00013) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/algonquin/00013/