Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

Rhode Island Energy - E. Providence (PROVIDENCE,RI)

Algonquin Gas Transmission · Loc 00010 · PROVIDENCE, Rhode Island
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.019
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 26
7-day average
0.019
Bcf/d
30-day average
0.017
30 of 30 days posted
30-day high
0.025
Nov 24
30-day low
0.011
Nov 4
Operating capacity
0.138
Bcf/d as posted, late_0005 cycle
Utilization
14%
headroom 86%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.019-0.000
Nov 260.019-0.004
Nov 250.023-0.002
Nov 240.025+0.007
Nov 230.018+0.003
Nov 220.015-0.001
Nov 210.016+0.001
Nov 200.015-0.002
Nov 190.018+0.001
Nov 180.017-0.002
Nov 170.019-0.002
Nov 160.022+0.000
Nov 150.022+0.001
Nov 140.021-0.000
Nov 130.021+0.003
Nov 120.017+0.001
Nov 110.017-0.000
Nov 100.017+0.003
Nov 90.014+0.001
Nov 80.012+0.001
Nov 70.011-0.001
Nov 60.012+0.001
Nov 50.011+0.000
Nov 40.011-0.000
Nov 30.011-0.002
Nov 20.014+0.001
Nov 10.013-0.008
Oct 310.021+0.000
Oct 300.021+0.006
Oct 290.015—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionRhode Island Energy - E. Providence (PROVIDENCE,RI)

Algonquin Gas TransmissionPlaced at the center of Providence, RI — approximate; the exact meter site is not published.

Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Rhode Island Energy - E. Providence (PROVIDENCE,RI) (Algonquin Gas Transmission loc 00010) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/algonquin/00010/