Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

Rhode Island Energy-WESTERLY (WASHINGTON,RI)

Algonquin Gas Transmission · Loc 00008 · WASHINGTON, Rhode Island
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.002
Bcf/d scheduled
Δ Day-over-day
-0.004
vs Nov 25
7-day average
0.004
Bcf/d
30-day average
0.004
30 of 30 days posted
30-day high
0.006
Nov 13
30-day low
0.002
Nov 26
Operating capacity
0.005
Bcf/d as posted, late_0005 cycle
Utilization
43%
headroom 57%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0020.0040.0060.008Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.002-0.004
Nov 250.006-0.000
Nov 240.006+0.002
Nov 230.004+0.001
Nov 220.003-0.001
Nov 210.004-0.001
Nov 200.005-0.000
Nov 190.005-0.000
Nov 180.005-0.000
Nov 170.005-0.000
Nov 160.006+0.000
Nov 150.006+0.000
Nov 140.006-0.001
Nov 130.006+0.002
Nov 120.004+0.000
Nov 110.004-0.001
Nov 100.005+0.002
Nov 90.003-0.002
Nov 80.005+0.001
Nov 70.004+0.001
Nov 60.003+0.000
Nov 50.003+0.000
Nov 40.003-0.001
Nov 30.004-0.001
Nov 20.004+0.000
Nov 10.004-0.000
Oct 310.004+0.000
Oct 300.004+0.000
Oct 290.004-0.000
Oct 280.005—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionRhode Island Energy-WESTERLY (WASHINGTON,RI)

Algonquin Gas TransmissionPlaced at the center of Washington, RI — approximate; the exact meter site is not published.

Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Rhode Island Energy-WESTERLY (WASHINGTON,RI) (Algonquin Gas Transmission loc 00008) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/algonquin/00008/