Transwestern Pipeline

[Transwestern Pipeline] [Force Majeure] Force Majeure - Station 3 (Leupp, AZ.) - Compressor Station mechanical Failure - Gas Day 10/24/26 (Until Further Notice)

SEV 4/5
Force Majeure capped at 1.100 Bcf/d, cut unknown

Transwestern Pipeline declared force majeure at Station 3 (Leupp, AZ) due to a compressor station mechanical failure, effective Gas Day October 24, 2026 until further notice. The Mainline Thoreau West System capacity is restricted to approximately 1.1 Bcf/d with no stated restoration timeline. No pre-event baseline is available in the notice itself to quantify the net reduction, but the 1.1 Bcf/d ceiling on a major westbound segment represents a material capacity constraint on Permian/San Juan outbound flows toward SoCal and Arizona.

TW force majeure at Station 3 caps Mainline Thoreau West at 1.1 Bcf/d UFN; expect bearish pressure at Waha/Permian as westbound takeaway tightens, with bullish pressure at SoCal Border and Arizona delivery points -- EPNG is the only remaining major California-bound alternative.
Reroute: Moderate: EPNG serves the same SoCal border and Arizona markets and is the primary competing pipeline, but a simultaneous EPNG constraint would leave California with no reroute option. At current TW capacity restriction levels, some westbound reroute via EPNG is possible but may not fully offset the constrained volumes.
View original notice text
Loading…
Force Majeure capped at 1.100 Bcf/d, cut unknown 9 Days

Transwestern Pipeline has declared a Force Majeure effective Gas Day October 24, 2026 due to a compressor station mechanical failure at Station 3 in Leupp, AZ. The Mainline Thoreau West System capacity is reduced to approximately 1.1 Bcf/d until further notice, with a currently stated end date of November 2, 2026. This is an unplanned event on a major westbound supply artery serving Arizona and California SoCal border markets.

Transwestern FM at Station 3 (Leupp, AZ) caps Thoreau West System at 1.1 Bcf/d; expect bullish pressure at SoCal Border and Arizona delivery points as westbound capacity is constrained, while Permian/Waha and San Juan basin points face bearish pressure from backed-up supply -- no pre-event baseline available to quantify the net reduction from the stated 1.1 Bcf/d ceiling, and EPNG is the only partial reroute for California markets.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and is the primary competing pipeline; however, if EPNG is simultaneously constrained, California supply reroute drops to none. TW and EPNG together represent the two dominant westbound arteries from the Permian and San Juan basins.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 3/5
Force Majeure 1 Days

Transwestern Pipeline has re-posted its Thoreau West System force majeure under a new notice ID (TW-121517), shifting the constraint window one day earlier to Oct 24-25 gas days (was Oct 25-26 per TW-121513). The duration remains one gas day. No new capacity figures are provided; pre-event westbound flow past Station 3 (Leupp, AZ) was a median of ~1.11 Bcf/d (range 1.04-1.26 Bcf/d), but no cap is stated so the net cut remains unquantified.

TW Thoreau West FM window has shifted to Oct 24-25 (ending one day earlier than TW-121513 indicated), a modest easing signal; pre-event westbound flow ~1.11 Bcf/d but net cut unquantified -- expect continued bearish Transwestern Permian/San Juan basis as stranded basin gas backs up, with offsetting bullish pressure at SoCal Border and Arizona delivery points for the Oct 24 gas day.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border deliveries from the Permian/San Juan Basin; however, if EPNG is simultaneously constrained there is no California reroute.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 3/5
Force Majeure 1 Days

Transwestern Pipeline has posted a new force majeure notice (TW-121513) for the M/L Thoreau West System, extending the westbound constraint window by one day relative to the prior posting TW-121508 -- now effective Oct 25 9:00AM through Oct 26 8:59AM (one gas day). No capacity cap is stated in either notice; the pre-event baseline past Station 3 (Leupp, AZ) was ~1.11 Bcf/d (range 1.04-1.26 over Oct 17-23), so the net cut remains unquantified but could approach that level depending on severity. The force majeure notice scores a minimum 3 despite no stated cap because no grounded net cut can be calculated.

TW force majeure on Thoreau West shifts the constraint window to Oct 25-26 gas days (extended by one day vs TW-121508); pre-event westbound flow past Station 3 was ~1.11 Bcf/d -- net cut unquantified but expect bearish pressure at Transwestern Permian/San Juan basis as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border and Arizona deliveries from the Permian/San Juan Basin; however, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
Transco

Location Confirmations Being Reduced for 10/24/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 3/5
Force Majeure 1 Days

Transwestern Pipeline has posted a force majeure on the Thoreau West mainline system effective Oct 24 through Oct 25 (approximately one gas day). This notice is an administrative re-post of TW-121499 under a new notice ID with no change in operational content, window, or stated capacity impact. Pre-event flow past Station 3 (Leupp, AZ) was approximately 1.11 Bcf/d (range 1.04-1.26 Bcf/d over Oct 17-23); no new ceiling is stated, so the net reduction remains unquantified.

TW force majeure on Thoreau West restricts westbound flow for ~1 day with pre-event throughput ~1.11 Bcf/d past Station 3; no stated cap means net cut is unquantified -- expect bearish pressure at Transwestern Permian/San Juan basis as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points; no new market signal vs TW-121499.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border deliveries; however, if EPNG is simultaneously constrained, California reroute would be eliminated. No live EPNG constraint is noted in this posting.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 3/5
Force Majeure 1 Days

Transwestern Pipeline has declared force majeure on the Mainline Thoreau West System effective Oct 24 2026 9:00AM through Oct 25 2026 8:59AM -- a ~1 gas day window. This notice (TW-121499) is a re-posting of TW-121486 filed the same day with no change in operational content, location, or duration. Pre-event throughput past Station 3 (Leupp, AZ) was approximately 1.11 Bcf/d (range 1.04-1.26 over the prior week), but no capacity cap is stated so the net cut remains unquantified.

TW force majeure on Thoreau West restricts westbound flow for ~1 day with pre-event throughput ~1.11 Bcf/d past Station 3; no stated cap means net cut is unquantified -- expect bearish pressure at Transwestern Permian/San Juan basis as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points; this posting adds no new operational information vs TW-121486.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and is the primary alternative; however, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 3/5
Force Majeure 1 Days

Transwestern Pipeline declared a force majeure on the M/L Thoreau West System effective Oct 24, 2026 at 9:00 AM through Oct 25, 2026 at 8:59 AM -- a roughly 24-hour window. No specific capacity restriction volume is stated in the notice. Pre-event flow past Station 3 (Leupp, AZ) on the Thoreau West mainline averaged ~1.22 Bcf/d (range 1.10-1.26 Bcf/d) over the prior week; the actual cut is unknown without a stated cap.

TW force majeure on Thoreau West system restricts westbound flow for ~1 day; pre-event throughput was ~1.22 Bcf/d past Station 3, but no capacity cap is stated so the net cut is unquantified -- expect bearish pressure at Transwestern Permian/San Juan basis and bullish pressure at SoCal Border and Arizona delivery points for Oct 24 gas day.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and may absorb some displaced volume, but no stated capacity figure limits the assessment of EPNG's available headroom.
View original notice text
Loading…
ANR Pipeline (TC Energy)

UPDATED: CAPACITY REDUCTION - Southeast Area

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Heidelberg Compressor Station Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
ANR Pipeline (TC Energy)

CAPACITY REDUCTION Southeast Mainline – Jena Southbound & Evangeline Southbound

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR NOVEMBER 2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Iroquois Gas Transmission

Capacity Constraint

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[OPERATIONAL FLOW ORDER] SOC Declaration - Location Specific Pack

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Iroquois Gas Transmission

Capacity Constraint

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Enable Gas Transmission (EGT)

[Enable Gas Transmission (EGT)] [Maintenance] CHANDLER FMJ

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Midcontinent Express

[MAINTENANCE] OUTAGE IMPACT REPORT - 10-23-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Southern Natural Gas

[MAINTENANCE] Completion Sched Maint Seg 200 Hartwell

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Southern Natural Gas

[MAINTENANCE] Complete Schd Maint Thomaston SEG 490

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Pipeline Maintenance- Location 2764 Mitchellville (Portland)

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Southern Star

Planned Service Outage - October 23rd, 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
ANR Pipeline (TC Energy)

MAINTENANCE SCHEDULE for ANR Pipeline

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gas Transmission (TCO)

CAPACITY POSTING - TIM for October 24, 2026, through October 26, 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Transco

Updated - Market and Production Constraints

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gulf Transmission (CGT)

CAPACITY POSTING - TIM for October 24, 2026 through October 26, 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Southern Natural Gas

[OPERATIONAL FLOW ORDER] Type 6 OFO for Long Effective 10-24-2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Southern Natural Gas

[MAINTENANCE] Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Midcontinent Express

[MAINTENANCE] DESTIN CLARKE (LOC 44450) - METER MAINT

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gas Transmission (TCO)

Summerfield Compressor Station Maintenance, Effective October 27, 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[FORCE MAJEURE] FORCE MAJEURE - MORAINE LATERAL - LIFTED

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
National Fuel Gas Supply

Kaylor Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Iroquois Gas Transmission

Capacity Constraint

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

MLV 560-2 to MLV 563-2 Pipe Replacement

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Millennium Pipeline (MPC)

LIFTED: Hancock CS Maintenance October 22nd ID2

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Transco

REMINDER - Station 195 Outage (Job 578694) 2026 Planned Outage Maintenance Summary

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated November 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tallgrass Energy

[Tallgrass Interstate Gas Transmission (TIGT)] [MAINTENANCE] TIGT MAINTENANCE SCHEDULE FOR NOVEMBER 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated October 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR NOVEMBER 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Carthage #2 Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gas Transmission (TCO)

CAPACITY POSTING - TIM for October 23, 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Transco

Location Confirmations Being Reduced for 10/24/2026 - LIFTED

SEV 1/5
lifted ✓ Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kern River Gas Transmission

Kern River - Warning - Line Pack is High

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

RESULTS OS #1440

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

RESULTS OS #1441

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

EPSQ Overrides for Parks and Loans

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] OUTAGE IMPACT REPORT 10-23-26

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

TGP Outage Impact Report

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
ANR Pipeline (TC Energy)

MAINTENANCE SCHEDULE for ANR Pipeline

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Northwest Pipeline

Rangely Fuel Heater Panel Replacement - Maintenance Reminder

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gulf Transmission (CGT)

Columbia Pipelines October 2026 Monthly Customer Update – Today, October 22, 1:30 PM

UNSCORED
Informational
View original notice text
Loading…
Columbia Gas Transmission (TCO)

Columbia Pipelines October 2026 Monthly Customer Update – Today, October 22, 1:30 PM

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tallgrass Energy

[Cheyenne Connector] [MAINTENANCE] CHEYENNE CONNECTOR MAINTENANCE SCHEDULE FOR NOVEMBER 2026

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tallgrass Energy

[Ruby Pipeline] [MAINTENANCE] RUBY MAINTENANCE SCHEDULE FOR NOVEMBER 2026

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

AVAILABLE FIRM CAPACITY OS #1442

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Intra Cycle Setpoint Change Requests

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gulf Transmission (CGT)

CAPACITY POSTING - TIM for October 23, 2026

UNSCORED
Informational
View original notice text
Loading…
October 2026
504 notices
September 2026
782 notices
August 2026
2,480 notices
July 2026
703 notices
June 2026
586 notices
May 2026
506 notices
April 2026
722 notices
March 2026
467 notices