Sabine Pass Stage 5 Expansion is a set of new liquefaction trains at an existing terminal by Cheniere in LA. It is approved but has no final investment decision yet. Stated liquefaction capacity is 2.6 Bcf/d (FERC list figure), or 20 MTPA. Trains: 3 (T7-9). Timing is stated as FID early 2027. FERC dockets CP24-75, CP25-505. Sources: FERC, the sponsor's public material and trade press. Last verified by Enercast on Nov 27, 2026.
| Status | Approved | |
|---|---|---|
| Capacity | 2.6 Bcf/d stated FERC list figure | |
| Capacity, MTPA | 20 stated | |
| Trains | 3 (T7-9) | |
| Timing | FID early 2027 stated | |
| Sponsor | Cheniere | |
| Project type | New trains at existing terminal | |
| Terminal | Sabine · observed feedgas, daily → | |
| Location | LA | |
| Region | US Gulf Coast | |
| Regulator | FERC (onshore terminal) | |
| FERC docket | CP24-75, CP25-505 | |
| Last verified | Nov 27, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.
Feed gas into the Sabine terminal is measured daily from pipeline postings on its LNG feedgas page: that is where a commissioning ramp shows up first.
Milestones
- FERC authorization stated
Change log
No changes since this project was first listed on Nov 25, 2026.
Sources
- Company, May 28, 2026: Cheniere 2026-05-28
- FERC, Nov 17, 2026: FERC LNG export terminals list as of 2026-11-17
- FERC, Nov 19, 2026: FERC eLibrary 20261119-3052 (CP24-75): Order/Opinion / Commission Order/Opinion
- Trade press, Nov 23, 2026: Enerdata 2026-11-23