Sabine Pass Stage 5 Expansion

Cheniere · 2.6 Bcf/d stated · Approved

Sabine Pass Stage 5 Expansion is a set of new liquefaction trains at an existing terminal by Cheniere in LA. It is approved but has no final investment decision yet. Stated liquefaction capacity is 2.6 Bcf/d (FERC list figure), or 20 MTPA. Trains: 3 (T7-9). Timing is stated as FID early 2027. FERC dockets CP24-75, CP25-505. Sources: FERC, the sponsor's public material and trade press. Last verified by Enercast on Nov 27, 2026.

StatusApproved
Capacity2.6 Bcf/d stated FERC list figure
Capacity, MTPA20 stated
Trains3 (T7-9)
TimingFID early 2027 stated
SponsorCheniere
Project typeNew trains at existing terminal
TerminalSabine · observed feedgas, daily →
LocationLA
RegionUS Gulf Coast
RegulatorFERC (onshore terminal)
FERC docketCP24-75, CP25-505
Last verifiedNov 27, 2026all sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.

Feed gas into the Sabine terminal is measured daily from pipeline postings on its LNG feedgas page: that is where a commissioning ramp shows up first.

Milestones

Change log

No changes since this project was first listed on Nov 25, 2026.