Rio Grande LNG (Trains 1-5)

NextDecade · 4.16 Bcf/d stated · Under construction

Rio Grande LNG (Trains 1-5) is a new LNG export terminal by NextDecade in TX. It is under construction, with a final investment decision taken. Stated liquefaction capacity is 4.16 Bcf/d (FERC list figure), or 30 MTPA. Trains: 5. Timing is stated as T1-3 2027; T5 early 2031. FERC dockets CP16-454, CP26-31. Sources: FERC, the Department of Energy, the sponsor's public material and EIA's liquefaction capacity file. Last verified by Enercast on Nov 27, 2026.

StatusUnder construction
Capacity4.16 Bcf/d stated FERC list figure
Capacity, MTPA30 stated
DOE non-FTA export authorization3.61 Bcf/d
Trains5
TimingT1-3 2027; T5 early 2031 stated
SponsorNextDecade
Project typeNew terminal
Terminal——
LocationTX
RegionUS Gulf Coast
RegulatorFERC (onshore terminal)
FERC docketCP16-454, CP26-31
Last verifiedNov 27, 2026all sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.

Milestones

No dated milestones recorded yet. They are added as FERC orders and letters, DOE authorizations and the sponsor’s own announcements (FID, first LNG, first cargo) appear.

Trains

TrainBcf/dBasisTiming as statedNote
Train 10.72EIA nominal2027EIA row 'Rio Grande LNG Phase 1 Train 1'; peak 0.773 Bcf/d; EIA file released 2025-06-30
Train 20.72EIA nominal2027EIA row 'Rio Grande LNG Phase 1 Train 2'; peak 0.773 Bcf/d; EIA file released 2025-06-30
Train 30.72EIA nominal2028EIA row 'Rio Grande LNG Phase 1 Train 3'; peak 0.773 Bcf/d; EIA file released 2025-06-30

From EIA’s U.S. liquefaction capacity file and FERC filings, as stated. EIA’s file is updated irregularly; the project’s own timing above is the more recent statement.

Change log

No changes since this project was first listed on Nov 25, 2026.