Rio Grande LNG (Trains 1-5) is a new LNG export terminal by NextDecade in TX. It is under construction, with a final investment decision taken. Stated liquefaction capacity is 4.16 Bcf/d (FERC list figure), or 30 MTPA. Trains: 5. Timing is stated as T1-3 2027; T5 early 2031. FERC dockets CP16-454, CP26-31. Sources: FERC, the Department of Energy, the sponsor's public material and EIA's liquefaction capacity file. Last verified by Enercast on Nov 27, 2026.
| Status | Under construction | |
|---|---|---|
| Capacity | 4.16 Bcf/d stated FERC list figure | |
| Capacity, MTPA | 30 stated | |
| DOE non-FTA export authorization | 3.61 Bcf/d | |
| Trains | 5 | |
| Timing | T1-3 2027; T5 early 2031 stated | |
| Sponsor | NextDecade | |
| Project type | New terminal | |
| Terminal | — | — |
| Location | TX | |
| Region | US Gulf Coast | |
| Regulator | FERC (onshore terminal) | |
| FERC docket | CP16-454, CP26-31 | |
| Last verified | Nov 27, 2026 | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.
Milestones
No dated milestones recorded yet. They are added as FERC orders and letters, DOE authorizations and the sponsor’s own announcements (FID, first LNG, first cargo) appear.
Trains
| Train | Bcf/d | Basis | Timing as stated | Note |
|---|---|---|---|---|
| Train 1 | 0.72 | EIA nominal | 2027 | EIA row 'Rio Grande LNG Phase 1 Train 1'; peak 0.773 Bcf/d; EIA file released 2025-06-30 |
| Train 2 | 0.72 | EIA nominal | 2027 | EIA row 'Rio Grande LNG Phase 1 Train 2'; peak 0.773 Bcf/d; EIA file released 2025-06-30 |
| Train 3 | 0.72 | EIA nominal | 2028 | EIA row 'Rio Grande LNG Phase 1 Train 3'; peak 0.773 Bcf/d; EIA file released 2025-06-30 |
From EIA’s U.S. liquefaction capacity file and FERC filings, as stated. EIA’s file is updated irregularly; the project’s own timing above is the more recent statement.
Change log
No changes since this project was first listed on Nov 25, 2026.
Sources
- Company, Oct 17, 2025: OGJ 2025-10-17
- FERC, Nov 17, 2026: FERC LNG export terminals list as of 2026-11-17
- DOE: DOE LNG Snapshot Sep 2026
- Company: NextDecade: Rio Grande LNG page“Q2 2027 Expected First LNG”
- EIA, Jun 30, 2025: EIA U.S. Liquefaction Capacity file, release 2025-06-30