Port Arthur LNG Phase 2 (Trains 3-4) is a set of new liquefaction trains at an existing terminal by Sempra Infrastructure in TX. It is under construction, with a final investment decision taken. Stated liquefaction capacity is 1.86 Bcf/d (derived (FERC list split) figure), or 13 MTPA. Trains: 2 (Trains 3-4). Timing is stated as T3 2030; T4 2031. FERC docket CP20-55. Sources: the sponsor's public material and trade press.
| Status | Under construction | |
|---|---|---|
| Capacity | 1.86 Bcf/d derived derived (FERC list split) figure 1.86 Bcf/d is DERIVED: half of the 3.72 Bcf/d FERC lists for Phases 1 and 2 together, split evenly by Enercast. RBN reports two trains of about 1.0 Bcf/d each; Sempra states about 13 MTPA. Final investment decision announced 2025-09-23; commercial operation expected 2030 (Train 3) and 2031 (Train 4). Split from the combined listing on 2026-11-27. | |
| Capacity, MTPA | 13 stated | |
| Trains | 2 (Trains 3-4) | |
| Timing | T3 2030; T4 2031 stated | |
| Sponsor | Sempra Infrastructure | |
| Project type | New trains at existing terminal | |
| Terminal | — | — |
| Location | TX | |
| Region | US Gulf Coast | |
| Regulator | FERC (onshore terminal) | |
| FERC docket | CP20-55 | |
| Last verified | Not yet | all sources fetched |
Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.
Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.
Milestones
- DOE non-FTA export authorization stated
- Final investment decision stated
Change log
No changes since this project was first listed on Nov 27, 2026.
Sources
- Trade press, May 29, 2025: OGJ: Sempra wins DOE LNG export authorization for Port Arthur LNG Phase 2“final authorization to export LNG to non-free trade agreement countries from its proposed 13.4-million tonne/year (tpy) Port Arthur LNG Phase 2 expansion project ... on May 29.”
- Company, Sep 23, 2025: Sempra Infrastructure: Port Arthur LNG Phase 2 final investment decision“a positive final investment decision (FID) for Port Arthur LNG Phase 2”
- Trade press, Sep 23, 2025: OGJ: Sempra advances Port Arthur LNG Phase 2 with FID, $14 billion investment“Phase 2 includes two natural gas liquefaction trains, one LNG storage tank, and associated infrastructure with a combined nameplate capacity of about 13 million tpy.”
- Trade press: RBN