Enercast  /  New LNG Export  /  Port Arthur LNG Phase 2 (Trains 3-4)

Port Arthur LNG Phase 2 (Trains 3-4)

Sempra Infrastructure · 1.86 Bcf/d stated · Under construction

Port Arthur LNG Phase 2 (Trains 3-4) is a set of new liquefaction trains at an existing terminal by Sempra Infrastructure in TX. It is under construction, with a final investment decision taken. Stated liquefaction capacity is 1.86 Bcf/d (derived (FERC list split) figure), or 13 MTPA. Trains: 2 (Trains 3-4). Timing is stated as T3 2030; T4 2031. FERC docket CP20-55. Sources: the sponsor's public material and trade press.

StatusUnder construction
Capacity1.86 Bcf/d derived derived (FERC list split) figure
1.86 Bcf/d is DERIVED: half of the 3.72 Bcf/d FERC lists for Phases 1 and 2 together, split evenly by Enercast. RBN reports two trains of about 1.0 Bcf/d each; Sempra states about 13 MTPA. Final investment decision announced 2025-09-23; commercial operation expected 2030 (Train 3) and 2031 (Train 4). Split from the combined listing on 2026-11-27.
Capacity, MTPA13 stated
Trains2 (Trains 3-4)
TimingT3 2030; T4 2031 stated
SponsorSempra Infrastructure
Project typeNew trains at existing terminal
Terminal——
LocationTX
RegionUS Gulf Coast
RegulatorFERC (onshore terminal)
FERC docketCP20-55
Last verifiedNot yetall sources fetched

Facts with no source beside them were compiled by Enercast from the documents listed under Sources when the project was first listed.

Capacity and timing are what the source states. None is measured or forecast by Enercast. How to read this page. The website and free subscribers get updates weekly. Pro subscribers get them daily.

Milestones

Change log

No changes since this project was first listed on Nov 27, 2026.